Where is the best location for leveling a crane?
Upperworks
What is the best method for determining gross load?
Get an accurate load weight and add the rigging
By order of hitch strength, which is the correct order?
Basket , vertical, choker
What is the purpose of using a jib?
Increase height
When taking a side strain on a boom, what concerns the operator the most?
Boom damage
You should always have at least how many wraps on a hoist drum?
Two
On a load chart, values above the bold line mean
Capacities based on structural competence
The primary purpose for a rooster sheave or auxiliary boom point sheave is to?
Separate the hoist lines
When the number of layers of rope on a drum increases the….
Line pull decreases
According to OSHA 1926.1408-table A, what is the minimum allowable distance from the crane load line to the power lines, with lines rated at 63 kv?
15 ft
The term upperworks or superstructure refer to the area of the crane…..
Above the turntable
Side loading may be caused by?
Starting or stopping the swing to rapidly
What is the best procedure to follow when underground utilities may be present?
Get information from the controlling entity
Eccentric main boom tip reeving causes…..
Torsion or twisting of the boom
How many randomly broken wires must there be to remove a 6x25 running wire rope from service?
6
When lifting Personnel in a man basket using 6x19 wire rope, the minimum safety Factor is?
7
What is the Safety Factor required when using non-rotating wire rope and lifting personnel in a man basket?
10:1
Who has the responsibility to verify that the load is within the rated capacity of the equipment?
Operator
If replacing the hoist line wire rope on a crane, how do you determine the size or type of wire rope to use?
Use the manufacturer’s operators manual or load chart
According to ASME B30.5 and B30.23, Personnel platform lifts shall not be made with wind in excess of…..
20 mph
When is it safe to work closer than the allowable distance from Power lines?
When the utility company says the lines are de-energized
During setup, how do you determine machine clearances (counterweight, boom, outriggers)?
Measure for correct distance
When operating a crawler crane, what is the most unstable allowable quadrant of operation?
Side
When operating a truck crane, what is the most unstable allowable quadrant of operation?
Side
When should a tagline be used?
When rotation of load would be dangerous
When an operator arrives at the job site and the crane is already erected, how would the operator check the main and auxiliary hoist brakes?
Lift the load off the ground a few inches and apply the brake
What is the difference between an anti-two-block warning device and an anti-two-block prevention system?
A warning device warns you, a prevention system stops the function
Who gives the operator hand signals?
The qualified person assigned prior to the lift
Why use mats or cribbing?
To reduce ground pressure
Tipping capacities of crawler cranes are based on what percentage of tipping?
75%
Should the load be applied when determining the proper boom angle?
Yes
When should the operator use the “Run by the seat of your pants” technique?
Never
Load radius is the distance from the center of gravity of the suspended load to the…..
Center of rotation
What is the primary reason for using a boom extension?
Increase height
What is the minimum design factor required for 6x25 right regular lay running rope?
3.5
On cranes with individually controlled power boom sections, unless otherwise specified, the sections must be extended how?
All sections should be telescoped equally
How does the operator determine if the correct load chart is being used?
Matching serial numbers
What is net capacity?
Gross capacity minus deductions
If the SWL (safe working limit) of a cranes wire rope is 10,000lbs using one part, what is the SWL using four parts?
40,000lbs
When first arriving on the job site, the operator should first determine the condition of the…..
Access road
How does the operator verify the LMI’s boom length or load radius reading?
Actual measurements
If the rated capacity of the crane is above the solid line or within the shaded areas or has an asterisk next to it, this means the capacity is based on:
Structural competence
How many broken wires must be present in one strand of one lay for 6x37 running wire rope to be removed from service?
3
In a range diagram, boom length and angle can be used to determine approximately what?
Load radius
What is the best type of tagline to use around power lines?
Dry polypropylene
When making a multiple crane lift, what is important for the operator to understand?
The weight may increase if the other crane lands the load first
If a crane is not set up level and the operator swings a load from the high side to the low side the load radius will…..
Increase
Most crane manufacturers reduce load capacity for duty cycle operations because…..
Side loading forces may occur
On whose recommendations should a preventative maintenance program be set up?
Crane manufacturer
What is the standard rope used on most cranes?
Right regular lay
What is the proper way to calibrate a boom angle indicator?
Using a level, raise or lower the boom to horizontal and set the indicator at 0°
The red area of an instrument gauge means?
A dangerous condition exists
The best way to keep people from being injured from the counterweight of the crane is to:
Erect and maintain control lines
Only approved attachments or extra counterweights made by the manufacturer should be placed on the rear of the crane because…..
They could cause a backward stability problem
What’s the first thing an operator should do before going under a low pipe rack?
Post a signal person to check clearance
When working on outriggers, the only time they should be less than fully extended is when…..
There is a load chart for this operation
When lifting loads from the water, what should the operator be aware of?
The load will increase when you pick the load from the water
What is required on a hydraulic crane in order to attach and use a Personnel platform?
Boom length indicator
When working on rubber, cranes are rated at what percentage of tipping?
75%
What is the backward stability of a crane is tested with?
Basic boom at maximum angle with no load
For main boom capacities when either boom length or radius are between values listed, you should:
Use the next longer or shorter boom length, whichever is the least capacity
When a spinning load presents a danger, the operator should:
Use a tagline
The jib capacity is 8 tons and the ball weighs 900 lbs. What is the heaviest load that can be lifted safely?
15,100 lbs
What do “Parts of Line” mean?
The number of lines running through the load block
If a jib is erected but not being used, it is treated as a deduction from the cranes what?
Gross capacity
What is the maximum number of broken wires acceptable before replacement on a standing wire rope?
2
What are most jib capacities based on?
Structural capacity
On the majority of conventional cranes, power is transferred to the torque converter by a…..
Master clutch
During disassembly of a long boom, the pendant lines are connected at the maximum cantilever point, (the pendants are under tension and the boom tip is touching the ground) which pins are to be removed first?
The bottom pins ahead of the cantilever point
When using load/capacity charts, what does the term “Jib Angle to Ground” refer to?
Main boom angle minus the jibs offset
A truck crane, without riggers properly set, is rated at what percentage of its tipping capacity?
85%
On a truck crane with outriggers extended and set, and tires touching the ground, the operator should refer to what load chart?
On rubber chart
When testing a Personnel platform, how long must the proof test be maintained?
5 minutes
What is the minimum pitch diameter for load block sheaves?
Not less than 16 times rope diameter
Power is transferred to the swing through a…..
Pinion gear
LMI’s shall be installed on cranes with a lifting capacity of…..
3 ton and above
When lifting personnel, the cranes hook must be the type that…..
Can be closed and locked
What is the maximum advisable wind speed for Crane operation?
Follow manufacturer’s recommendations
When working near power lines, where should Hazard stickers be installed?
In the operator’s cab, and at least two on the outside of the crane
For jib backlash, how much is allowed?
5 degrees
Cranes must be level within what percentage?
1%
According to ASME B30.5, a frequent inspection is:
Daily to monthly
According to ASME B30.5, a periodic inspection is:
Monthly to annually
Test loads shall not exceed ______ of manufacturer’s load ratings
100%
According to OSHA, how often should a daily inspection be performed
Each shift
According to OSHA, cranes lifting Personnel platforms must have an inspection performed each:
Shift and after the trial lift
Crane hooks must not be twisted in excess of:
Any visibly apparent bend or twist from the plane of the unbent hook
Crane hooks throat opening must not exceed:
5% of its original size - not to exceed 1/4 in
What is the jib offset?
Jib angle to the Boom