Case Study - Questions Flashcards

1
Q

How did you prepare the design for the re-roofing works?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What type of warranty did you use?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Why was it that Giromax? Did you Specify it?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How did you manage safe access onto the roof for your inspection given the contractor was not using this area of the roof?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Did you consider any other procurement routes?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How did you ensure that the interstitual fabric was dry prior to overlaying the roof?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How did you ensure the roofs were safe to work on?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

From photos noted rooflight replacements – what measures were in place for fall arrest through the rooflights?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Programme timescale 3 months pre-discovery of cuts and implementation of final solution – what measures were in place to prevent further water ingress?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Any potential issues with liquid system in late November early December? If the weather wasn’t agreeable what would you have done?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

How did you confirm suitability of the overlay system?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What documents and permissions did you request from drone contractor prior to doing the survey?Were they appointed through royal mail by ourselves?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What limitations were there with drone surveys?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Key priority was keeping birds off roof – why was this important.?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Small cuts to single ply membrane – how did you trace the leaks back to the cuts.?

A

Could have done die/water testing. Be careful because water tracks through construction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How did you determine that the cuts were not caused by Contractor?

A
17
Q

Did the PC do a photographic condition schedule prior to starting work?

A
18
Q
A