How did you prepare the design for the re-roofing works?
What type of warranty did you use?
Why was it that Giromax? Did you Specify it?
How did you manage safe access onto the roof for your inspection given the contractor was not using this area of the roof?
Did you consider any other procurement routes?
How did you ensure that the interstitual fabric was dry prior to overlaying the roof?
How did you ensure the roofs were safe to work on?
From photos noted rooflight replacements – what measures were in place for fall arrest through the rooflights?
Programme timescale 3 months pre-discovery of cuts and implementation of final solution – what measures were in place to prevent further water ingress?
Any potential issues with liquid system in late November early December? If the weather wasn’t agreeable what would you have done?
How did you confirm suitability of the overlay system?
What documents and permissions did you request from drone contractor prior to doing the survey?Were they appointed through royal mail by ourselves?
What limitations were there with drone surveys?
Key priority was keeping birds off roof – why was this important.?
Small cuts to single ply membrane – how did you trace the leaks back to the cuts.?
Could have done die/water testing. Be careful because water tracks through construction.