1
Q
Container Delivery System reference
A
AFI 13-217
2
Q
Additional width needed for DZ not in trail:
- C-130 Hercules: Personnel/Heavy equipment
- C-17 Globemaster III: Heavy Equipment
- x2 C-17 Globemaster III: Personnel
- x3 C-17 Globemaster III: Personnel
A
- 100 yds
- 100 yds
- 640 yds
- 1200 yds
3
Q
Add length to DZ for each heavy equipment platforms:
- C-130 Hercules
- C-17 Globemaster III
A
- 400 yds
- 500 yds
4
Q
ADEPT Option I
ADEPT Option II
Mass exit
A
- one door, one pass. Half jumpers per pass minus 1
- both paratroop doors, one at a time. Total number of jumpers per pass minus 1
- both doors simultaneously. Divide in half, use lower number
5
Q
Point of impact placement
- CDS from C-130 Hercules (day/night)
- CDS from C-17 Globemaster III (day/night)
- Personnel (day/night)
- Heavy equipment (day/night)
A
- 200 yds/250 yds
- 225 yds/275 yds
- 300 yds/350 yds
- 500 yds/550 yds
6
Q
DZSO/DZSTL control centers
- Personnel
- CDS
- Heavy Equipment
- Adverse Weather Aerial Delivery System
A
- code letter, PPI
- 200 yds from code letter or PI
- 300 yds from code letter or HEPI
- Best vantages point