C143/C143M - 15a: Slump of Hydraulic-Cement Concrete Flashcards

1
Q

The slump test is applicable to plastic concrete with a maximum size aggregate of

A

1.5”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When the concrete contains aggregate larger than allowed for the slump test, the large aggregate must be

A

Wet sieved

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The mold for making the slump test is in the shape of

A

A cone

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The height of the slump mold is

A

12” I 1/8”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

True or False?:

The interior surface of the slump mold is allowed to have minor irregularities

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

For use in the slump test, the tamping end of both ends of the tamping rod must be

A

Rounded to a hemispherical tip of same diameter as rod

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The sample of concrete for use in making the slump test must be obtained in accordance with practice

A

C172

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

True or False?

The slump mold should be in a dry condition before beginning the test.

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The surface on which the slump mold will be placed must be

A

Flat, moist, non absorbent and rigid

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The slump mold is filled in

A

3 layers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Each layer should fill approximately

A

1/3 the volume of the mold.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The approximate concrete depth (in vertical distance) after placing the first layer is ________ and the second layer is _________

A

2 5/8”

6 1/8”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Rod each layer ______times uniformly over the cross section with the rounded end of the rod.

A

25

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How deep should the tamping rod penetrate into each layer?

A

The entire length of layers plus 1” for upper two layers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When rodding the bottom layer, the tamping rod must be ___________ to uniformly distribute the strokes.

A

Inclined Slightly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What must be done if the concrete drops below the top of the slump mold while the top layer is being rodded?

A

Add more concrete and continue rodding count from last blow

17
Q

Prior to lifting the mold, concrete must be removed from ________________

A

The top of the core and around the base mold

18
Q

True or False?:

After the final rodding, the sides of the slump mold should be tapped lightly with the tampering rod.

A

True

19
Q

True or False?:

When raising the slump mold, it should not be rotated or twisted.

A

True

20
Q

How much time allowed for lifting the slump mold?

A

+ 2 seconds

21
Q

The measurement for slump is made fr the top of the mold to what point of the concrete specimen?

A

Displaced original center of the top surface at specimen

22
Q

The slump of the concrete is measured and reported to the nearest _________

A

1/4”

23
Q

How much time is allowed to conduct the slump test from beginning to completion?

A

2 1/2 minutes