Buisness of Wind Energy Flashcards
1
Q
What are the 3 options used to manage a wind farm maintenance?
A
- OEM (Original Equipment Manufacturer) maintenance contracts
- Independent Service Providers (ISP)
- Self-perform
2
Q
What is a “reclamation bond”?
A
Money required to be set aside prior to construction for restoring the land if the wind farm is abandoned.
3
Q
What is the revenue per megawatt for asset owners (for the entire market regardless of asset age).
A
1.6 million / MW generated in total revenue
(If maintained by an independent maintenance service provider/contract (ISP) up to 2-2.6 million total revenue)
4
Q
In 2023, what is the estimated cost per MWh per DOE?
1) Onshore turbines
2) Offshore fixed bottom
3) Offshore floating
A
1) $30 / MWh Onshore turbines
2) $80 / MWh Offshore fixed bottom
3) $200 / MWh Offshore floating