Building Walls Flashcards
Method #33
Building Walls
Method #34
Maintain 2 ft walk aisle between the face of the wall and end of load device when standing on floor
Method #35
Position label up, out towards the rear or in towards the center of trailer
Method #36
Always attempt to place opening of the box up.
Method #37
Orient boxes so that the ribs or furrows (flutes) are vertical to prevent damage to a package.
Method #38
Follow orientation instructions printed on box, arrows, or this side up
Method #39
Option #1- Cornerstone package 18 to 24 inches in depth and 12 to 24 inches in height.
Method #40
Cornerstone loaded in the left corner against previous wall. No space between package and previous wall.
Method #41
Select and load conerstone for next wall at anytime while building present wall
Method #42
Option #2- Primary Shelf- Continue bottom shelf left to right keeping front of wall nearly flush
Method #43
Option #3- Secondary or new shelf- if next selected package is taller than primary shelf, start a new shelf
Method #44
Option #4- Fill empty space or level shelves. If package is shorter than primary shelf
Method #45
level shelfs or fill empty space. Do not exceed height of shelf
Method #46
Determine height of next shelf; consider size of available packages
Method #47
Tighten or “lock in” shelf with last package on the right of the wall