block 2 air speed Flashcards
Explain the basic purpose(s) of the AIRSpeed Program
is the NAE process to operationalize cost-wise readiness
What are the three primary AIRSpeed CPI methods?
Lean -Six Sigma -Theory of Constraints
Describe the Lean methodology
War on Waste which focuses on work flow, customer value, and eliminating process waste
4 Describe the Six Sigma methodology
War on Variation “Eliminates variation” which focuses on satisfying customer requirements while minimizing waste by reducing and controlling variation
Describe the Theory of Constraints (TOC) methodology
Mitigation of constraints “Find the bottle neck” which focuses on systems thinking and improved throughput by addressing system constraints.
Define 5S and list the associated steps
Sort -Straighten -Shine -Standardize -Sustain
Who is responsible for the utilization of the 5S checklist?
Work Center Supervisor
Describe NAT and state the purpose of NAT reports
Niin Analysis Tool provides maintenance managers with an enterprise view of all NIINs (National Item Identification Number) processed at Intermediate Maintenance Activities (IMAs).
Demonstrate use of the NAT to look for improvement opportunities
- Various reports may be generated to compare Ready For Issue (RFI) repair capability rates, Beyond Capability of Maintenance (BCM) transactions and Individual Component Repair List (ICRL) capability codes with other IMAs.
10 Describe BMT and state the purpose of BMT reports.
Buffer Management Tool The BMT is a workload tracking and analysis tool that provides the information needed to assist in the decision making process regarding workload prioritization