1
Q
What is Bill of Material?
A
Norsk = Stykklister
It is a list of all the raw materials, components, and sub-assemblies required to produce a finished product
2
Q
5 elements of the BOM
A
- Reference number & description of item (EX: 6710 seat)
- Units & Units of measure (stuk = 1pc, kg = 10kg)
- Scrap, extra costs (Ex: 10% scrap)
- Purchase items (indicated with different color)
- Low Level Code (LLC)
LLC 0 = The finished product
LLC 1 = Last step before finished item, can f.ex be purchase items mixed with a constructed item from purchase items bought in previous LLC