Banbury To Oxford - Up Flashcards
BN80 middle of shunt discs has been known to jam in off position, what instructions relating to this
If already off after changing ends then make sure points are set
If unable to see points then contact Banbury North to ask
Which platform can you arrive and change ends without shunting
Platform 1 - semaphore on left
Platform 2 - semaphore on right
Both at end of platform
Departing from platforms 1 or 2 what speed through crossover to up main and risks at next signal
15mph
Next signal can still be red
Line speed after Banbury
90mph
4 crossings between Aynho and Heyford and which is R/G crossing
Abernathy
Chiswell farm
Somerton - R/G
Knaptons
Kings Sutton dispatch method
Mirror
Next speed restriction after kings Sutton
75mph - Aynho
If the next signal after Kings Sutton is single flashing yellow what do you need to do
Stop at the signal and contact signaller
Routes from signal protecting Aynho
Main aspect - Up main
J.I.1 - Up goods
J.I.2 - Chiltern
J.I.4 - Chiltern
On approach to Kings Sutton state aspects possible on BS108
Red Double yellow Double flashing yellow Green Cannot show single yellow
If BS108 is showing double flashing yellow where are you routed
Down Bicester reversible
After BS108 what do you need
PRI - arrow straight up
If junction signal at Aynho is red then what is in the PRI
Nothing
Can you be signalled towards Chiltern on green aspect
Yes
Check PRI
Route indications from turn back signal BS106 at Aynho on Down main
UM - Up main
UG - Up goods
UB - Up Bicester
DB - Down Bicester reversible