B2 Flashcards
1
Q
At concrete form inspection, the inspector checks for what?
A
Bearing surface
No standing water
Rebar installed correctly
2
Q
What is required prior to a framing inspection
A
Electrical, plumbing, heating and ventilation rough ins
3
Q
What must be done to the outside of a building prior to installing insulation
A
Must be weather tight
4
Q
When is perimeter drainage inspected
A
Prior to backfill
5
Q
Which inspections require a pressure test
A
Water and waste
Gas
Sprinkler system
6
Q
What is inspected at the rough on stage of electrical construction
A
Main service and all wiring
7
Q
What is the man concern at the final inspection
A
Handrails Guards Building address number Smoke Heat Co2 Alarms Other safety requirements