AUC 5_2 add 1 and 2 Flashcards
Where the occupancy does not exceed two separate individual units the following requirements shall be applicable:
- The artist’s studio quarters must have adequate means of egress.
- The building must not have any type of occupancy listed as a high fire hazard.
- The artist must notify the DOB in writing of the exact location of the studio in question so that an inspection can be made
- A sign readily visible must be displayed on the outside of the building to indicate that there is an artist residing in the building
The sign specifications established by the Department of Buildings are as follows:
- Sign must be of metal 8x10
- 2” black letters on white background.
- Seven feet above sidewalk level.
- As close as possible to the main entrance on front wall outside of building reading
New building the working deck reaches a height of 75 feet or greater above the ground in a building for which a standpipe system will be required, a permanent or temporary standpipe system shall be kept in a state of readiness at all times for use by fire-fighting personnel. The standpipe system shall serve
all floors where the permanent stairs are required.
During the course of construction of a new building, or in spaces being added to an existing building, at least one permanent stair shall be brought to within a distance of 40 feet or 4 floors below the working deck at all times.
So standpipe is also 40ft / 4 floors below working deck
In all other locations where permanent stairs will be required, a TEMPORARY or permanent stair shall be brought to within a distance of 40 feet or 4 floors below the working deck at all times
Agree / Disagree
Agree
• Stairs in an existing building undergoing alteration or a partial demolition shall be maintained.
• All stairs in a building undergoing construction or demolition shall be lighted at all times and kept free of equipment, debris, and material.
Agree / Disagree
Agree
Existing standpipe systems in structures undergoing a full demolition shall be maintained as
dry standpipes.
also provided the standpipe system is equipped with an air pressurized alarm system IF BUILDING 75’ or greater.
At the commencement of demolition, the standpipe risers shall be capped where ?
Does standpipe hose need to be maintained ?
above the outlet on the floor immediately below the floor being demolished
Standpipe hose, nozzles and spanners are not required to be maintained and may be removed at any time.
The red paint shall be maintained during any demolition operations. All existing house check valves shall remain in place until completion of the demolition work.
True or False
True
When, during the course of the construction of a new building which will have a occupiable space at a depth of 75 feet or greater below the level of the ground in a building for which a standpipe system will be required, a permanent or temporary standpipe system shall be installed. When ?
The standpipe system shall serve all stories below grade and shall be installed as soon as a temporary or permanent stair is installed below grade. No standpipe shall be considered to be in a state of readiness unless it is painted red.
When, during the course of alteration or partial demolition operations in a building for which a standpipe system is required, the standpipe system shall be maintained. In an unoccupied building, an existing wet standpipe system may be maintained as a
dry system subject to the approval of the commissioner and the commissioner of the fire department, and also provided the standpipe system is equipped with an air pressurized alarm system. No standpipe shall be considered to be in a state of readiness unless it is painted red.
• Vacant Buildings Being Demolished: Existing standpipes must be
dry standpipes and have an air-pressurized alarm
• New Buildings Higher than 75 Feet: Temporary and permanent dry standpipes must have
an air-pressurized alarm
Fire department hose connections shall be kept free from obstruction and shall be marked by a metal sign reading,
“Standpipe Connection” and by a red light at night.
- All exposed standpipes AND SPRINKLER piping must be painted RED. The law outlines specific exceptions, such as branch piping.
- Dedicated standpipe valve handles must be painted
red.
All buildings – no matter the size or occupancy must comply with these new requirements.
Combination standpipe valve handles must be painted
yellow
All buildings – no matter the size or occupancy must comply with these new requirements.