AUC Flashcards
OV position in the subway relay
The foot of the stairs leading to the platform within 50 yards of the chauffeur
Subway relay truck chauffeur position where
Bottom of subway entrance stairs within 50 yards of the stairs to the street
Roof firefighter in the subway relay
Approximately 50 yards from the stairs on the platform
Engine officer on the subway relay
100 yards straight line of roof firefighter
Truck officer location subway relay
At the location of the fire
Additional HT equipped members space how far apart in the subway relay
100 yards if necessary
Can you use the radio on a subway train to communicate
Yes to use the relay to ticket booth
Subway relay is measured in
All in yards
AUC 200 when do we start preplanning for winter weather
October 1
AUC 200 what tools are needed during a nice and snow emergency
6 lengths of 2 1/2” hose rolled or folded on each Engine and Ladder
2 shovels
Salt or sand
Vehicle recovery straps and shackles
Tire chains spare links and link tool
Specialized hydrant connections set-up as determined by individual commanding officers
AUC 200 what should MUD cover
Water supply problems Operations involving dead-end streets in cul-de-sac Remote locations Local special problem The deployment of resources at the scene
AUC 200 what is another good source of water during winter operations
Fire Boat,yard hydrants drafting standpipes
AUC 200 when does requisitions be in for special tools for winter of operation? When do you call the division Cordinator if the tools have not arrived?
July 1st
October 1st
AUC 200 how many shovels shall be maintained in quarters for shoveling snow from in front of the firehouse and hydrants
6
AUC 200 at what temperature and time. Do we need to go out and check for frozen hydrants
25* F for 24 hours
AUC 200 what color disks do we put on a frozen hydrant and what paperwork do we do afterwards
Yellow disk and report to administrative battalion if in their first due area. Anywhere else notify administrative company
AUC 200 when should companies go out on reconnaissance and surveillance operations
3 hour intervals Main arteries Percentage of response area impassable Specific large areas or special hazards inaccessible Action taken
AUC 200 when entering a snow covered street who goes first
3 stories or more ladder engine hands stretches, 3 or less engine goes first and ladder brings portables
AUC 200. when hooking up directly to hydrant what device do you
Two way gate
AUC 180 10-25 code 1,2,3,4
“B” extend to building
“U” smoke under pressure blown manholes cover
“S” smoke seeping
“T” fire or smoke from a transformer pole vault or room
AUC 180 which codes has Con Ed dispatched
Code 1 and 4
AUC 180 what 2 things should we not move at manhole fires
Cars and manhole covers
AUC 180 what is the time limit on leaving one company to watch a manhole
30 minutes
AUC 180 what are the options if Con Ed can’t get a truck on scene in 30 min for a manhole
- leave unit on scene and in service to response to alarms with one member left behind
- One member left at scene and company returns to quarters with relief provided
- When Menber left at scene office make frequent contact with dispatcher to re-notifaction of utility
- Manhole protected by traffic cones and tape and all units put back in service
AUC 180 member left at scene of a manhole should do what?
- Be alert to changing conditions and shall call foe assistance
- Maintain surveillance of surrounding properties
- Prevent entry to area by pedestrians and other vehicle traffic
- Obtain information necessary for required reports
AUC 180 what type of cooling oil does con Edison use in their Transformers
Sun-oil or Mobil-x with a range of 10-49 PPM OF PCBs which is consider non PCB.