APU Flashcards
What type of APU is used on the CRJ 900
Allied Signal RE 220
What are the priorities of the APU
Electrical first
Pneumatic second
Max APU generator load
40 KVA at 41,000 feet
Max operating altitude for the APU
41,000 feet
Max altitude for starting the APU
37,000 feet
Max altitude for APU bleed air extraction
25,000 feet
Max speed with APU door open
220 KIAS if APU not operating
Vmo, Mmo is APU is operating
Minimum battery voltage required before starting the APU
22 volts on both the main and APU battery
What does the main battery power during APU start
APU Electrical Control Unit (ECU)
What does the APU bettery power during APU start
The 28 volt DC APU start motor
When will the START portion of the START/STOP switchlight extinguish
46-60% APU RPM
When will the AVAIL portion of the START/STOP switchlight illuminate
99% RPM plus 2 seconds
What are the APU starter limits
No more than 3 start attempts in one hour
2 minute delay required between start attempts