AP Practice Test Questions Flashcards
A new office project is conducting an air quality test to demonstrate compliance with IEQ Credit 3.2 Construction IAQ
Management Plan, Before Occupancy. The 65,000 square foot project runs under one ventilation system. All finishes are
complete and have been installed, except for the movable furniture which is to be installed within the next 2 days. All of the
following statements are true in regards to the project team’s approach to meeting this credit EXCEPT: (Choose 1)
A. The air testing must be performed after the furniture is installed
B. 3 sample locations are required for the project
C. Air samples must be collected within the breathing zone of 3 and 6 feet
D. Measurements must be taken during normal occupied hours
A. The air testing must be performed after the furniture is installed
What is the overall % recycled content a project must earn in order to achieve an ID credit for exemplary performance under
MR Credit 4 Recycled Content?
A. 25%
B. 30%
C. 40%
D. 95%
A. 25%
A team plans to integrate SS Credit 10 Joint use of Facilities on a school project. Which of the following would be
acceptable LEED strategies in achieving this credit?
A. Shared use (w/general public) of an auditorium, classroom, and parking facility
B. A contract with community for a commercial office and health clinic dedicated-use spaces in the building
C. Pedestrian access and approved student use of privately owned swimming pool and playing field
D. All of the above
D. All of the above
In order to comply with SS Credit 1 Site Selection, which of the following site locations would be most appropriate to build a
new multi-family development?
A. Undeveloped land with elevation equal to the 100 year flood plain
B. Developed land that is within 45 feet from stream
C. Developed site that is 110 feet from wetland
D. Undeveloped land with a plant identified under the threatened species list
E. Developed land that includes some areas of prime farmland
C. Developed site that is 110 feet from wetland
A small office building has a total cost of $400,000. The project is registered under the LEED for NC rating system. What is the minimum amount of materials that must be salvaged, refurbished, or reused to qualify for 2 points under Materials and Resources credit, Material Reuse?
A. $12,000 B. $15,000 C. $18,000 D. $25,000 E. $40,000
C. $18,000
Material cost=45% of total construction cost
NC and Schools - 5%=1 pt., 10%=2 pts. (15%=Exemplary)
CS - 5% = 1 pt. (10%=Exemplary)
What percentage of a building’s total energy needs to be produced on site to earn three points for Energy and Atmosphere credit, On-Site Renewable Energy for a LEED NC project?
A. 2.5% B. 5% C. 7.5% D. 10% E. 12.5%
B. 5%
NC and schools - 1%=1 pt., 3%=2 pts., 5%=3 pts., 7%=4 pts., 9%=5 pts., 11%=6 pts., 13%=7 pts. (15%=Exemplary)
CS - 1% = 4 pts. (5%=Exemplary)
When calculating the Landscape Coefficient, what variable accounts for the number of plants and the total leaf area of a landscape?
A. Species factor
B. Density factor
C. Microclimate factor
D. Spacing factor
B. Density factor
Landscape Coefficient (KL)=Species Factor (Ks) x Density Factor (Kd) x Microclimate Factor (Kmc)
Installing metering equipment to measure energy use is done as part of which credit?
A. Optimize Energy Performance B. On-Site Renewable Energy C. Enhanced Commissioning D. Measurement and Verification E. Green Power
D. Measurement and Verification
Which of the following activities MUST the CxA perform to comply with Energy and Atmosphere credit, Enhanced Commissioning? (Choose 3)
A. Conduct one commissioning design review of the Owner’s Project Requirements (OPR), Basis of Design (BOD), and design documents prior to mid-construction documents
B. Review contractor submittals applicable to systems being commissioned
C. Develop a systems manual
D. Verify that the requirements for training operating personnel and building occupants are completed
E. Review building operation within 10 months after substantial completion with O&M staff and occupants
F. Be present at all inspections by the local jurisdiction
A. Conduct one commissioning design review …
B. Review contractor submittals applicable to systems being commissioned
E. Review building operation within 10 months after substantial completion
Any other team member can do C. or D.
Which of the following would be included in the submittal documents for IEQ credit, Indoor Chemical and Pollutant Source Control? (Choose 3)
A. Confirmation of MERV 8 or better HVAC filters
B. Confirmation of MERV 13 or better HVAC filters
C. Confirmation of entryway systems
D. Confirmation that no smoking is allowed in the building
E. Copy of the mechanical equipment product data
F. A building maintenance plan
B. MERV 13 or better
C. Confirm of entryway systems
F. A building maintenance plan
How much does a project’s landscape irrigation need to be reduced, from a calculated mid-summer baseline case, in order to ear 2 points for the WE credit, Water Efficient Landscaping under LEED C&S?
A. 20%
B. 40%
C. 50%
D. 100% or no landscaping irrigation
C. 50%
Reduce by 100% to get 4 points
Which of the following is NOT considered a composite wood or agrifiber product? (Choose 2)
A. Plywood B. Strawboard C. Framing lumber D. Plastic laminate E. Particleboard F. Medium Density Fiberboard
C. Framing lumber
D. Particleboard
Door cores are also considered, while any materials considered fit-out, furniture, and equipment are not included.
Which of the following are required of wood products to qualify for Materials and Resources credit, Certified Wood?
A. CBECS certified
B. Must be recycled material
C. Must be classified as a renewable resource by the USDA
D. Must be harvested within 500 miles of the project
E. Must be permanently installed in the project
F. FSC certified
E. FSC certified
Which of the following estimates the true cost of a product, including original cost plus the cost of maintenance over the product’s lifetime?
A. Life-cost study
B. Total product cost analysis
C. Real cost study
D. Lifecycle cost analysis
D. Lifecycle cost analysis
Which of the following materials would be included in calculations for IEQ credit, Low-Emitting Materials: Composite Wood & Agrifiber Products? (Choose 3)
A. Particleboard shelving in a storage room B. Solid oak flooring C. MDF wall base D. Interior door cores E. Plywood used on an exterior sign
A. Particleboard
C. MDF wall base
D. Interior door cores
A new factory will have 150 FTEs and 100 part-time employees (4 hours/day). To qualify for SS credit, Alternative Transportation: Bicycle Storage & Changing Rooms, the design team must plan on a minimum of ___ bike rack spaces and ___ shower and changing facilities in the building.
A. 30, 0 B. 30, 3 C. 5, 2 D. 10, 0 E. 10, 1 F. 10, 2
E. 10, 1
5% bike racks, .5% showers
A school has 350 students and 30 FTE staff members. For LEED calculations, how many water closet and urinal uses would be assumed for this school.
A. 750 water closet uses and 190 urinal uses
B. 190 water closet uses and 190 urinal uses
C. 570 water closet uses and 380 urinal uses
D. 760 water closet uses and 380 urinal uses
E. 380 water closet uses and 190 urinal uses
D. 760 water closet uses and 380 urinal uses
Assume 190 male, 190 female. Female - 190 x 3 water closet uses/day=570. Male - 190 x 1 water closet use/day=190 + 2 urinal uses/day=380
Which option would NOT be a good strategy to earn a point for SS credit, Stormwater Design: Quality Control?
A. Specifying a vegetated roof
B. Installing pervious paving
C. Implementing a stormwater recovery system to flush toilets
D. Providing waterless urinals
D. Providing waterless urinals
A LEED for Schools project has been calculated to have an annual energy cost of $200,000. As part of the mechanical design, a ground-source heat pump will produce $20,000 worth of this energy. How many LEED points would this project be eligible for under EA credit, On-Site Renewable Energy?
A. 0 B. 1 C. 2 D. 5 E. 7
A .0
Geo-exchange systems (ground-source heat pumps), passive solar and daylighting are not eligible for EA credit, On-Site Renwable Energy.
For the purposes of calculating recycled content, what assumptions can be made about the recycled content of steel, if no other information is available?
A. Steel requires a certificate stating it's recycled content B. 20% pre-consumer content C. 25% pre-consumer content D. 20% post-consumer content E. 25% post-consumer content
E. 25% post-consumer content