All Qns Flashcards

1
Q
  1. You are reviewing the master data type for Supply Planning
    Which master data type are compound master data type.
    Note: There are 2 correct option
    - SOURCELOCATION
    - LOCATIONFR
    - SOURCEPRODUCTION
    - SOURCECUSTOMER
A

SOURCELOCATION

SOURCECUSTOMER

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. Which one of the following values can you use in disaggregation expressions?

Please choose the correct answer.

  • KF1 (Stored) + KF2 (Stored) + Attribute
  • KF1 (Stored) + Helper KF
  • KF1 (Calculated) + Attribute
  • If (Attribute!=O, KF1 (Stored), KF2 (Calculated))
A

KF1 (Stored) + KF2 (Stored) + Attribute

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. Which of the following global parameters can be used to initialize the value of the forecast input keyfigure when historical data is missing for some period
    - Forecast_Allow parameter in Forecast group
    - Forecast_escapenull parameter in Forecast group
    - Max_Dim_Members parameter in Plan_view group
    - MTHMISSIONS parameter in scenario group
A

Forecast_escapenull parameter in Forecast group

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. You are working on a mid range plan that spans the season peak and you are evaluating
    Which of the following parameter can you model to plan production with
    - Incremental Production values
    - Production source validity at the start of seasonal peak
    - Capacity expansion with additional cost
    - Adjusted production interactive values
A
  • Capacity expansion with additional cost
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. Which of the following data can be tracked using a change history enabled keyfigures
    Note there are 3 correct answer
  • Keyfigure Type
  • Scenario ID
  • Attributes
  • Reason Code
  • Modified date
A
  • Attributes
  • Reason Code
  • Modified date
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. You want to setup demand sensing to analyze demand changes
    Which of the following condition must you consider during the setup
  • The result generates sensed demand data at the monthly time granularity for the full time horizon
  • It is mandatory to load historical lag based snapshot data
  • At setup test the system to run the demand sensing full algorithm weekly and the demand sensing (update) on a daily basis
  • Set up the forecast model to be executed at product location level
A
  • It is mandatory to load historical lag based snapshot data
  • At setup test the system to run the demand sensing full algorithm weekly and the demand sensing (update) on a daily basis
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. Analytics charts are created by the user in the Advanced Analytics application
    What action are possible in the Advanced Analytics app
    Note: There are 2 correct answer
  • Apply filters on your data
  • Group data
  • Marge charts together
  • Open graphics in Excel
A
  • Apply filters on your data

- Group data

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. What are SOP operator optimizer parameter associated with demand fair share
    - Number of fair share segments , Maximum Inventory , Additional tiering cost(default)
    - Number of fair share segments Additional tiering cost (default) ., Target Inventory violation cost
    - Number of fair share segments , Maximum days of coverage , Number of fair share segments late delivery
    - Number of fair share segments , Additional tiering cost(default) , Number fair share segment late delivery
A
  • Number of fair share segments , Additional tiering cost(default) , Number fair share segment late delivery
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. Which of these conditions must be met to create a local member keyfigures
    - User Excel cell References in Report Editor is selected
    - Activate Local Member Recognition is selected
    - A Keyfigure is selected in the keyfigure tab in excel add in
    - A keyfigure is created in the Plannin area app
A
  • Activate Local Member Recognition is selected
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. You are at early project stage and are weighting consideration for changing the right solution to Supply
    Which unique capability of TS supply optimization will be implemented to help you make your decision
  • Work with push production using minimal resource utilization an aggregation production constraint
  • Refine distribution plan by lane for short term
  • Support demand driven planning with priority rules
  • Segment supply chain using subnetwork ID and running operators in parallel
A
  • Work with push production using minimal resource utilization an aggregation production constraint
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. Where can you use the Time series optimizer
    Note there are 2 correct answer
  • When generating a procurement plan for raw material and components
  • When generating an operational production plan at daily or weekly buckets
  • When creating a short term distribution plan
  • When creating simulation for tactical planning
A
  • When creating simulation for tactical planning

- When generating a procurement plan for raw material and components

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. Which of the following SAP IBP modules support operational supply planning
    - SAP IBP for response and supply
    - SAP IBP Supply
    - SAP IBP for inventory
    - SAP IBP for Sales and Operation
A
  • SAP IBP for response and supply
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. Which library is used by the forecasting engine for the demand sensing algorithm
  • Heuristic library
  • Supply chain algorithm library
  • Demand library
  • Predictive analytics library
A

Predictive analytics library

Also AFL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. What are the ways to achieve period shift in sap ibp calculation
    Note there are 2 correct answer
  • Use a native IBP Formula
  • Use an attribute as a Keyfigure
  • Use a local Member
  • User an attribute transformation
A
  • Use a local member

- User an attribute transformation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. Which objects do you need to upload before uploading keyfigure data
    - Time period and relevant master data
    - One simple master data records and one compound master data records
    - Time period and time profile attributes
    - Timer periods and business roles
A
  • Time period and relevant master data
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. What are some of the ways to create network visualization
    Note there are 2 correct answer
    - Use chart functionality in the planning view
    - Use a dedicated supply chain network app
    - Use an application job for network visualization data
    - Use the Analytics advanced app and create a supply chain network
A
  • Use a dedicated supply chain network app

- Use the Analytics advanced app and create a supply chain network

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q
17.	You are working with the inventory optimization process and you want to do what if analyse
Which parameters you select
Note there are 2 correct answers
-	Service levels
-	Changed variability
-	Capacity Consumption
-	Number of planning combination
A
  • Service levels

- Changed variability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
  1. A planning area can include one or more planning levels
    What are the features of a planning level
    Note there are 2 correct answers
    - A planning level is scenario specific
    - A planning level enables user to analyse and plan at different levels
    - A planning level is defined for each planning area , it is the level at which data is stored
    - A planning level is version specific
A
  • A planning level enables user to analyse and plan at different levels
  • A planning level is defined for each planning area , it is the level at which data is stored
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q
  1. What differentiates the Create New (Simple copy) and the Create New Dependencies ( Advanced copy)
    Note there are 2 correct answers
    - The planning view favorites are only copied when you use the Advanced copy
    - A copy of the time profile is only created when you use the Create New with Dependences (Advanced)
    - Associated attributes are only shared between the original and the new planning area when you use the Create New )Simple copy)
    - Master data is only shared between the original and the new planning area when you use the create new (simple copy)
A
  • A copy of the time profile is only created when you use the Create New with Dependences (Advanced)
  • Master data is only shared between the original and the new planning area when you use the create new (Advanced copy)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q
  1. Which of the following are function of SAP IBP for Demand
    Note there are 3 correct answers
    - Demand sensing of demand data using the supply chain algorithm library
    - Embedded on the fly demand analytics
    - Detailed statistical anlaysis of demand data using predictive analysis library
    - Demand sensing of demand data using predictive analysis tools
    - Detailed statistical analysis of demand data using the supply chain algorithm library
A
  • Embedded on the fly demand analytics
  • Detailed statistical anlaysis of demand data using predictive analysis library
  • Demand sensing of demand data using predictive analysis tools
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q
  1. You create a S&OP operator for heuristics on an SAP IBP project
    What must you enable for the S&OP operator that is specifically relevant for subnetwork
  • Normalize Quota parameter
  • Compute expected supply parameter
  • Supply propagation
  • Balance receipt parameter
A

Compute expected supply parameter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q
  1. Which of the following is one of the function of multi echelon inventory optimization
  • Ability to optimize delivery cost between different location
  • Ability to optimize lead time between different locations
  • Ability to maintain high external service level with high internal service level
  • Ability to maintain high external service level with low internal service level
A

Ability to maintain high external service level with high internal service level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q
  1. Which of the following stages can be modelled using scenario from the SOP planning cycle
    Note there are 2 correct answer
  • Demand Sensing stage
  • Demand supply balancing
  • Demand review
  • Data input review for inventory
A
  • Demand supply balancing

- Demand review

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q
  1. Which of the following key functions are supported by SOP
    Note there are 2 correct answer
    - An advanced demand planning process
    - Manual creation of feasible constrained plan
    - A basic demand planning process
    - Finite resource planning
A
  • Manual creation of feasible constrained plan

- A basic demand planning process

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q
  1. Which header names are available in the Report option in SAP IBP Excel
    Note there are 2 correct answer
    - Changes members names that the used had created
    - Caption as defined in configuration for the default names
    - Business meaning as defined in configuration
    - Full unique name including the dimension and technical name
A
  • Caption as defined in configuration for the default names

- Full unique name including the dimension and technical name

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q
  1. You have set up infinite SOP heuristic for unconstrained planning
    What must you do to model input as constraint
    Note there are 2 correct answers
    - Model Adjusted transport receipts
    - Set minimum and maximum lot sizes
    - Enter transportation lead times
    - Create product substitution
A
  • Model Adjusted transport receipts

- Enter transportation lead times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q
  1. How many different time levels can be selected within one planning view
    - All time levels available in the time profile by global configuration parameter
    - All time levels available in the time profile
    - Only base time levels of the planning area
    - Only time level from the base planning level of selected keyfigures
A

All time levels available in the time profile by global configuration parameter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q
28.	Which input parameter can you use to limit the scope of your supply planning run
Note there are 2 correct answer
-	Versions
-	Permission filter
-	Time period
-	Product location
A
  • Versions

- Time period

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q
  1. Which of the following are the key functions of supply chain control tower
    Note there are 2 correct answers
    - Ability to use task and case management
    - Ability to balance demand and supply
    - Ability to create smart alerts
    - Ability to create a feasible plan
A
  • Ability to create smart alerts

- Ability to use task and case management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q
  1. Which of the following are the function of local member keyfigure
    Note there are 2 correct answer
    - A local member can be added as a row or column in planning view
    - They are inserted in the front end by the addin and calculated using an excel function
    - Refreshing of a planning view delete local member keyfigure
    - They are inserted in the back end by the Web UI and calculated using Key figure calculation
A
  • A local member can be added as a row or column in planning view
  • They are inserted in the front end by the addin and calculated using an excel function
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q
  1. You want to display and edit data in different UOM
    Which of the following must you consider before you use UOM
    Note there are 3 correct answer
    - UOM is an attribute of a master data type such as product
    - UOM are usually not time independent
    - The conversion upload for each combination of Product location UOM through data integration
    - UOM are usually not time dependent
    - The planning view and analytics provide the user with the option to select the target UOM
A
  • UOM are usually not time independent
  • The planning view and analytics provide the user with the option to select the target UOM
  • UOM is an attribute of a master data type such as product
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q
  1. You are configuring disaggregation for 1 Keyfigure
    Which method you can apply
    Note there are 3 correct answer
    - Disaggregation in batch triggred by an application job
    - Disaggregation according to a user defined scenario
    - An internal system generated disaggregation
    - Proportional disaggregation by using KF2 in the expression
    - Disaggregation according to equal split
A
  • Proportional disaggregation by using KF2 in the expression
  • Disaggregation according to equal split
  • Disaggregation according to a user defined scenario
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q
33.	Which of the following can be used as an input for inventory level optimization
Note there are 2 correct answer
-	Reorder point
-	Lead time variance
-	Lot sizes
-	Target Inventory level
A
  • Lead time variance

- Lot sizes

34
Q
  1. When modelling for a large machine with high capital , you need it to be cost effective with minimal utilization
    Which solution would apply to this scenario
    Note there are 2 correct answer
    - Balance can be achieved between excessive prebuild and minimum resource utilization
    - Capacity leveling will be possible for production and storage resource
    - Excess stock can be generated and will need to the staged to overflow warehouse
    - Enough demand can be pulled forward and pull production will occur
A
  • Balance can be achieved between excessive prebuild and minimum resource utilization
  • Enough demand can be pulled forward and pull production will occur
35
Q
  1. What is a prerequisite for modelling outsource manufacturer with production capacity
    - Model target inventory and stocks at the outsource location
    - Use Production lead times and manage component at the outsource location
    - Ensure that multiple mode of transport set up
    - Model production cost for internal and external production resource in model priority
A
  • Model production cost for internal and external production resource in model priority
36
Q
  1. What kind of algorithm can you combined together to come up with the best Forecast in IBP
    Note there are 2 correct answer
    - Mid term like automated exponential smoothing and long term like
    - Short term one like Demand sensing and mid term one like gradient boosting
    - Mid one term like weighted average and machine learning uses like gradient boosting
    - Short term ones like demand sensing and mid term like weighted moving average
A
  • Mid one term like weighted average and machine learning uses like gradient boosting
  • Short term ones like demand sensing and mid term like weighted moving average
37
Q
  1. You need to limit value in projected periods of coverage to 999
    What must you do in the S&OP operator profile configuration
    - Enter 999 as global limit per message type
    - Enter 999 as a allowed quota deviation parameter
    - Enter 999 in infinite coverage parameter
    - Enter 999 as an addition parameter
A
  • Enter 999 in infinite coverage parameter
38
Q
  1. You are adding a value based filter to planning view
    Which of the following condition apply
    Note there are 3 correct answer
    - You can apply one value based filter per planning view
    - These filters can be used together with sub total/totals functionality filter in the same planning view
    - These filters are always applied based on the value stored in the database
    - The alerts dashboard is not available if a value based filer is set to the same planning view
A
  • These filters are always applied based on the value stored in the database
  • The alerts dashboard is not available if a value based filer is set to the same planning view
  • You can apply one value based filter per planning view
39
Q
  1. What are the mandatory setting when creating a new time profile
    Note there are 2 corrected answer
    - At least one attribute for the time profile levels
    - Description
    - A start and End date
    - An ID and Name
A
  • A start and End date

- An ID and Name

40
Q
  1. Which of the following are features of the SOP process template
    Note there are 2 correct answer
    - New instance of template allow for the re use of the same process
    - The number of steps in a process template is the same for all implementation
    - Each step decided in the template can have task associated with it
    - All process template are assigned to dashboard
A

New instance of template allow for the re use of the same process
Each step decided in the template can have task associated with it

41
Q
  1. What does ABC/XYZ segmentation allow you to do
    Note there are 2 correct answer
    - Identify inventory items that require
    - Analyze forecast accuracy by product class
    - Assign more appropriate inventory algorithm to planning objects
    - Tailor your forecast strategy and inventory optimization to segment characteristics.
A
  • Analyze forecast accuracy by product class

- Tailor your forecast strategy and inventory optimization to segment characteristics.

42
Q
42.	Which of the following setting can you use in your supply planning background job triggered
Note there are 2 correct answers
-	Target Currency
-	UOM to ID
-	Planning unit
-	Type of algorithm to use
A
  • Planning unit

- Type of algorithm to use

43
Q
  1. Which function would you use to configure YTD calc
    - IBP_LPA with static configuration as you are aggregation across
    - IBP_LPA with dynamic configuration to query keyfigure at request level
    - IBP_CAGGR with aggregation mode parameter set to SUM
    - IBP_CAGGR with parameter for time profile restart of a quarter
A
  • IBP_CAGGR with aggregation mode parameter set to SUM
44
Q
  1. End users are validating the SAP IBP solution and are concern with time taking to open template
    Which areas that impact performance the most should you consider checking
    Note there are 2 correct answer
    - Number of analytics charts displaying keyfigure values
    - Number of local member and complexity of calculation
    - Complex calculation graphs for keyfigures
    - Excessive IBP formatting in Excel UI
A
  • Excessive IBP formatting in Excel UI

- Number of local member and complexity of calculation

45
Q
  1. You need to create time period for the time profile in a planning area
    What should you be aware of when executing the create time profile application job
    - The application job cannot be schedule for immediate start
    - The application job can be run for multiple time profile at once
    - The planning area with this time profile must be activated so the application job can proceed
    - A time profile has to be activated so that application job you can proceed
A
  • A time profile has to be activated so that application job you can proceed
46
Q
46.	When you provide calculated and approved inventory parameter from sap ibp for inventory  what other ibp module take this as input
Note there are 2 correct answer
-	DDMRP
-	SAP IBP for demand
-	SAP IBP for Sales and operation
-	SAP IBP Response and supply
A
  • SAP IBP for Sales and operation

- SAP IBP Response and supply

47
Q
  1. A time profile is defined with the levels week , month , quarter and year
    Which period id will be assigned to quarter
    - PERIODID3
    - PERIODID0
    - PERIODID1
    - PERIODID2
48
Q
  1. Which configuration elements can be used to add meaning to the planning
    Note there are 2 correct answers
    - Microsoft excel notes in planning
    - Business meaning characteristic in keyfigure
    - Planning view notes
    - Reason code
A
  • Planning view notes

- Reason code

49
Q
  1. Which of the following approaches could you take to reduce run time of a optimizer
    Note there are 2 correct answer
    - Avoid using telescopic time bucket
    - Split into multiple planning area to support weekly vs daily planning
    - Increase the use of incremental lot size beyond the frozen horizon
    - Use a subnetwork ID to reduce the size of the problem
A
  • Avoid using telescopic time bucket

- Use a subnetwork ID to reduce the size of the problem

50
Q
  1. What are some of the prerequisite for configuring a planning area that result in a successful consistency check.
    Note there are 2 correct answer
    - Configure at least one calculated Keyfigure for the planning area
    - Assign the compound master data type and its component master data type
    - Configure at least two input keyfigure on the same planning level in a keyfigure calculation
    - Specify a planning horizon in the planning area for each level of the assigned time profile
A
  • Assign the compound master data type and its component master data type
  • Specify a planning horizon in the planning area for each level of the assigned time profile
51
Q
  1. Why would you set up a cascading filter in the planning view
    Note there are 2 correct answer
    - To filter attribute based on other attribute filters
    - To filter using attributes that have a large number of values
    - To filter attribute based on specific values
    - To filter data in for an application job template
A
  • To filter attribute based on other attribute filters

- To filter using attributes that have a large number of values

52
Q
  1. What is reference master data type
    - To create a join between two or more master data type
    - To reference an existing master data type
    - To combine two or more simple master data type
    - To reference a master data type from an external master data type
A
  • To reference an existing master data type
53
Q
53.	Which of the following planning entites must you set up when you configure a planning view
Note there are 2 correct answer
-	Time profile
-	Planning operator
-	Planning view templates
-	Attribute
A
  • Attribute

- Time profile

54
Q
  1. Which of the following solution are feasible when using the time series supply optimizer
    Note there are 3 correct answer
    - Violation of minimum resource utilization
    - Not fully satisfied demand
    - Not respecting production capacity
    - Violation of minimum aggregated inventory values
    - Not adhering to minimum transport values
A
  • Violation of minimum resource utilization
  • Not fully satisfied demand
  • Not adhering to minimum transport values
55
Q
  1. Which of the following condition are relevant for the subtotal in the planning view
    Note there are 2 correct answer
    - Only attribute based total can be added
    - The total value can be added before or after of the selected attribute
    - The values of the attribute based total at the highest attribute level in the planning level can be changed
    - The total number of attributes that can use subtotal in the planning view can be restricted
A
  • The total value can be added before or after of the selected attribute
  • The total number of attributes that can use subtotal in the planning view can be restricted
56
Q
  1. You need to define a new logic for a keyfigure to deriver values from PERPRODCUSTREGION to PERPRODCUST
    Which of the following configuration option are possible for the process
    Note there are 2 correct answer
    - Splitting the values from detailed to aggregated level by using copy operator
    - Splitting the values from aggregate to detailed level using multiplication by the proportion
    - Splitting the values from aggregated to detailed level based on stored split factor keyfgure
    - Splitting the value from aggregated to detailed level based on time profile attribute
A
  • Splitting the values from aggregate to detailed level using multiplication by the proportion
  • Splitting the values from aggregated to detailed level based on stored split factor keyfgure
57
Q
  1. Which conditions are perquisite for keyfigure disaggregation
    - The calculated keyfigure is available and aggregation mode is selected
    - The Keyfigure is stored and editable in the current and future
    - The keyfigure is set to not editable
    - The keyfigure is calculated and editable in the current and future
A

The Keyfigure is stored and editable in the current and future

58
Q
  1. Which objects can you use to model aggregated constraint in SAP IBP
    - A pair of special aggregated constrain keyfigures one for minimum and maximum
    - An aggregated constraint masterdata type which is assigned to production and inventory keyfigures
    - An aggregated constraint with production and transport keyfigure to define maximum
    - Only an additional attribute for the constraint values and level of production and transportation resources
A
  • An aggregated constraint with production and transport keyfigure to define maximum
59
Q
  1. You created a keyfigure and want to add calculations
    Which of the following rules do you consider
    Note there are 2 correct answer
    - Keyfigure can be calculated across different planning levels
    - The calculation chain for a keyfigure must always result in a calculated keyfigure
    - All keyfigure calculation have calculation input which can be marked as stored or calculated
    - Aggregation calculation using Sum or Max function must be based on a higher aggregate level
A
  • All keyfigure calculation have calculation input which can be marked as stored or calculated
  • Keyfigure can be calculated across different planning levels
60
Q
  1. Which of the following configuration options are part of the new keyfigure creation process
    Note there are 3 correct answer
    - Enabling fixing for the keyfigure
    - Setting disaggregation logic for the keyfigure
    - Setting permitted planning levels
    - Enabling planning notes for the keyfigures
    - Hiding or displaying totals for the keyfigure
A
  • Enabling fixing for the keyfigure
  • Setting disaggregation logic for the keyfigure
  • Enabling planning notes for the keyfigures
61
Q
  1. You set up periodic activites to support SOP and want to use a job chain to sequence these multiple steps
    What could you do to use a job chain to sequence these multiple steps
    Note there are 2 correct answers
    - Ensure that the job chain can continue after the most error steps fails
    - Select the recurrence pattern in the application job template app
    - Schedule the job chain for recurring execution in the application job tile
    - Set up the job chain with five steps or fewer in the application job template
A
  • Select the recurrence pattern in the application job template app
  • Schedule the job chain for recurring execution in the application job tile
62
Q
  1. You create a planning filter in the web ui app
    Which of the following objects can it be applied for
    Note there are 2 correct answer
    - Supply chain graph in supply chain network app
    - Planning view templates in the IBP ad in for Microsoft excel
    - Jobs in the application job app
    - Snapshot operator in the IBP add in for Microsoft excel
A
  • Planning view templates in the IBP ad in for Microsoft excel
  • Jobs in the application job app
63
Q
  1. You have set up a planning area and data is available. You adjust the necessary time profile setting and run consistency check
    Which settings can you change and still run a successful consistency check
    Note there are 2 correct answer
    - Change the description of the attribute in the time profile
    - Add a new time profile level to the time profile
    - Remove an attribute assigned to the time profile level if the attribute is used in a planning level
    - Change the past and future horizon of the levels in the time profile
A
  • Change the description of the attribute in the time profile
  • Change the past and future horizon of the levels in the time profile
64
Q
  1. You are designing the planning area granularity
    How do you construct the granularity of the data that is saved
    - Define a base planning level and assign a storage profile with the required granularity
    - Assign besides the base planning level a separate time profile for every additional planning level in the planning area
    - Assign a time profile and define the smallest granularity for every additional planning level
    - Assign a time profile and a storage profile in the planning area header configuration and for any additional planning level
A
  • Assign a time profile and define the smallest granularity for every additional planning level
65
Q
  1. What actions can be performed in the advanced dashboard application
    Note there are 3 correct answer
    - Display all assigned analytics on a single UI
    - Link two analytics charts
    - Add process templates
    - Organize charts
    - Rename the charts
A
  • Display all assigned analytics on a single UI
  • Add process templates
  • Organize charts
66
Q
  1. Which of the following functional areas are included in the out of the box SAP IBP SOP
    Note there are 3 correct answer
    - Demand driven material requirement planning
    - Finite resource capacities planning
    - Consensus demand planning
    - Executive review
    - Rough cut capacity planning
A
  • Consensus demand planning
  • Executive review
  • Rough cut capacity planning
67
Q
  1. You are using the resource location master data type
    How do you specify capacity supply as time dependent
    - Set the capacity supply additional attribute in the time profile
    - Set the capacity supply time series indication attribute as a key
    - Maintain the CAPASUPPLY keyfigure values in the planning area
    - Set the capacity supply time series indicator in the resource location master data type
A
  • Set the capacity supply time series indicator in the resource location master data type
68
Q
68.	Which of the following modes can you use when creating a constrained plan
Note there are 2 correct answer
-	Resource Maximization
-	Delivery maximization
-	Profit maximization
-	Production maximization
A
  • Delivery maximization

- Profit maximization

69
Q
  1. You run a what if analsysis and use the scenario planning function
    Which action can you perform
    Note there are 3 correct answer
    - Run a scenario specific inventory optimization job
    - Run a scenario specific demand sensing job
    - Change scenario specifc master data
    - Share data with other users
    - Display data in analytics
A
  • Run a scenario specific inventory optimization job
  • Share data with other users
  • Display data in analytics
70
Q
  1. Which of the following are features of lag based snapshots
    Note there are 2 correct answer
    - Target keyfigures for these snapshots are exposed to the user in planning views
    - Target keyfigures for these snapshot must have lag as a root attribute
    - Lag based snapshots are automatically assigned to a snapshot operator
    - Lag based snapshot are created in the configuration app for a fixed time range
A
  • Target keyfigures for these snapshots are exposed to the user in planning views
  • Target keyfigures for these snapshot must have lag as a root attribute
71
Q
  1. How can you make charts and dashboard private
    - Enable the relevant settings in the Advanced Analytics and Advanced dashboard application
    - Enable the relevant setting in the global configuration parameters
    - Choose only relevant keyfigures and filters in the Analytics advanced application
    - Set restriction for charts in the Permission filter application
A
  • Enable the relevant setting in the global configuration parameters
72
Q
  1. Which of the following checks for master data and keyfigures for check mode
    Note there are 3 correct answer
    - It checks whether the sourcing in the Production item master data type
    - IT checks whether the location product specified in the master data are connected by customer sourcing
    - It checks whether the heuristic detects cycle formed by nodes(such as location product) in the supply chain network
    - It checks whether the location resource specified in the master data form a cycle in the supply chain network
    - It checks whether the required planning level master data exist for a subset of input keyfigure
A

IT checks whether the location product specified in the master data are connected by customer sourcing

  • It checks whether the heuristic detects cycle formed by nodes(such as location product) in the supply chain network
  • It checks whether the required planning level master data exist for a subset of input keyfigure
73
Q
  1. While modelling cost for optimization you want to meet inventory target and meet demands in the short term
    Which of the following are valid relationship between cost you must adhere to
    Note there are 2 correct answer
    - Target inventory violation cost should be less than max inventory violation cost
    - Target inventory violation cost should be greater than inventory holding cost rate
    - Target inventory violation cost should be less than transportation cost rate
    - Target inventory violation cost should be greater than discount for demand lateness.
A
  • Target inventory violation cost should be greater than inventory holding cost rate
  • Target inventory violation cost should be greater than discount for demand lateness.
74
Q
74.	For which of the following application jobs can you enter planning filter as parameter
Note there are 2 correct answer
-	Purge keyfigure data
-	Purge master data
-	Create time periods for time profile
-	Purge non conforming data
A
  • Purge keyfigure data

- Purge master data

75
Q
  1. You define fixing for a keyfigure
    Which of he following functions are available for the keyfigure
    Note there are 2 correct answer
    - Fixing is possible for system editable keyfigure
    - Fixing is possible for a certain period including all child values in the hierarchy
    - Fixing is possible for manually editable keyfigure
    - Fixing is possible for a certain quantity of a keyfigure values
A
  • Fixing is possible for a certain period including all child values in the hierarchy
  • Fixing is possible for manually editable keyfigure
76
Q
  1. Which supply chain challenge is addressed by SAP IBP demand
    - Inability to understand and shape actual demand
    - Inability to synchronize supply and demand
    - Inability to responds to short terms changes in supply and demand
    - Inability to arrive at consensus demand
A
  • Inability to understand and shape actual demand
77
Q
  1. Model configuration allows the attribute of a master data type to be assigned as keyfigure
    Which features are relevant for this type of object
    - This object is not exposed to the user in planning views
    - This object contains user defined criterial that monitor execution of business plans
    - This type of keyfigures is not usually stored and it cannot be set to be editable
    - This object provides a single value for a unique planning combination
A
  • This object provides a single value for a unique planning combination
78
Q
  1. What are some of the available ABC segmentation methods in IBP
    Note there are 2 correct answers
    - By number of items (Sorted average)
    - By Pareto Principle(Sorted and Cumulative %)
    - By Pareto Principle(Sorted and Calculated values)
    - By Number of items (Sorted values)
A
  • By Number of items (Sorted values)

- By Pareto Principle(Sorted and Cumulative %)

79
Q
  1. Which of the following settings are relevant for planning notes
    Note there are 2 correct answer
    - Planning notes created on a higher level are disaggregate to base planning level of the keyfigure
    - It is possible to edit or delete planning notes that were created by other users without administration permission
    - It is possible to show planning notes from all planning levels
    - The number of period ID attribute planning node combination in the database is unlimited
A
  • Planning notes created on a higher level are disaggregate to base planning level of the keyfigure
  • It is possible to show planning notes from all planning levels
80
Q
  1. How is minimum resource utilization considered by the optimizer
    Note there are 2 correct answer
    - It will be met in all buckets for all quantities that represent the minimum utilization
    - It will be achieved in the short term and then tail off in future buckets due to discount
    - It depends on demands in future bucket , if there is no demand it will not be respected
    - Minimum resource utilization may bot be achieved in full if there is restricted storage capacity
A
  • It depends on demands in future bucket , if there is no demand it will not be respected
  • Minimum resource utilization may bot be achieved in full if there is restricted storage capacity