Airfield Lighting Systems and Airfield Surfaces Flashcards

1
Q

What are the airfield lighting systems?

A

Man-Portable (VIPIR)
MOSLS
Legacy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the three kits within MOSLS?

A

Minimum Operating Strip Lighting Kit (MOSKIT)
Supplement Airfield Lighting Kit (SALKIT)
Cable Kit (CABKIT){trailer and QuadCon}

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the types of surfacing systems in the Marine Corps?

A

Mobi-Matting

AM-2 (Airfield Matting 2d Generation)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are some characteristics of Mobi-matting?

A

Short term
Rotary wing aircraft only
No Ospreys or Harriers
90 days or less

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the different variants of AM-2 matting?

A

F-71 - 18 full sheets (12’X2’) 155 pounds
F-72 - 18 half sheets (6’X’2’) 77 pounds
F-73 - 22 Heavy Duty half sheets (6’X18”) 95 pounds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the different types of key locks and what are they used for?

A

Starter Key Lock - male/male - for staring from center and working out
Normal Key Lock - male/female - provides separation between larger sections of matting
Female - female/female for starting from the outside and working in

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are stakes used for?

A

prevent lateral shift of matting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are anchors used for?

A

prevent vertical shift of matting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are CBR requirements for airfield surfaces?

A

Mobi-matting - CBR 6
AM-2 for VTOL/VSTOL - CBR 4
AM-2 for C-17 - CBR 25

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the configurations of Mobi-matting?

A
1X4 Matrix (56X33)
2X4 Matrix (56X66)
3X7 Matrix (97X99)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the AM-2 certifiable configuration lay patterns?

A

Brickwork Pattern
3-4 Pattern
2-1 Pattern

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the only lay patterns authorized for runway construction?

A

Brickwork Pattern

2-1 Pattern

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the runway gradient criteria?

A

RW Longitudinal 3%
RW Transverse 2%
Grade Change 1”/12’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the taxiway gradient criteria?

A

TW Longitudinal 3%
TW Transverse 3%
Grade Change 1”/12’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the parking areas gradient criteria?

A

Pkg Longitudinal 5%
Pkg Transverse 5%
Grade Change 1”/12’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are flat locking bars used for?

A

To form a non-separable joint in AM-2 matting

17
Q

What are “H” connectors used for?

A

To join two AM-2 matting patterns that are adjacent to each other at a 90 degree angle.

18
Q

What is the average mat laying rate for AM-2?

A

3,300 sqft/hour utilizing one 16-man crew on an eight hour shift