Aircraft Loading Flashcards

1
Q

What are the three steps used to select aircraft loading equipment (MHE)?

A

Obtain cargo information
Determine MHE requirements
Inspect for serviceability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the three steps for loading cargo?

A

Obtain documentation
Inspect
Load cargo

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The necessary cargo load information is found on form _________, __________ or the ___________.

A

AF Form 4080, GATES load pull sheet, GATES pre-manifest

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The three types of cargo moved on AMC aircraft are:

A

Palletized, loose cargo, rolling stock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

__________ is the section within ATOC responsible for selecting cargo for air transport.

A

Load planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

_________ is the work center tasked with selecting and then assembling the aircraft load using the documentation provided.

A

Ramp service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

During inspection, compare the form _________ with the data on the form _____________.

A

DD Form 2775, AF Form 4080

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If any discrepancy is found during inspection, it must be _______ immediately if possible. If not, __________ must be notified.

A

Corrected, load planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

DD Form 1387 checks for _____, _____, and _____. Not ______.

A

Weight, TCN, destination, pallet ID

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

DD Form 2775 checks for _____, _____, ______. Not _______.

A

Weight, TCN, pallet ID, TCN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The aircraft load will be placed on a __________ in the same sequence it will be in on the aircraft using AF Form 4080.

A

Highline dock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

To place the pallets on a highline dock, you will need a __________, a ________, ________, and a ________.

A

10K forklift, driver, spotter, chocker

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

To identify the assembled load, make a _____ with the ______, ______, and _______ on it.

A

Placard, aircraft type/tail number, destination, parking spot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The _______ ensures that ample clearance is available and the risk of an accident is minimized.

A

Chocker

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Ensure the following steps have been completed prior to loading an aircraft: The aircraft is grounded, ______ and ______ are ready to accept the load, and are clear of obstructions. Proper fire extinguishers are ________. Tail/ramp supports are ________. Main gear wheels are _______.

A

Deck, rails, nearby, installed, chocked

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

You can change the dual rail system to a/an ______ on most cargo aircraft.

A

Clear deck

17
Q

The two loading methods used with the C-17 are the ________ loading method and the ___________ loading method.

A

Ground ramp, horizontal ramp

18
Q

The three basic loading methods of loading aircraft are _________, _________, and _____________.

A

Ground ramp, horizontal ramp, side door loading

19
Q

A loading aid is designed specifically for _________ and _________.

A

Loading, offloading

20
Q

The aircraft winch is operated by the __________.

A

Loadmaster

21
Q

The load team ensures that the _________, commonly referred to as a “milk stool,” is installed properly.

A

Ramp support

22
Q

The ground loading ramps attached to the end of the aircraft ramp are used to load ___________.

A

Rolling stock

23
Q

___________ are used on commercial aircraft to support the aircraft tail during on/offloading operations.

A

Tail supports

24
Q

____________ are utilized on the aft of the C-5 and C-17 to help support the aft when heavy cargo is loaded.

A

Stabilizer struts

25
Q

______, also known as “Ramp Toes”, are attached to the end of the aircraft ramp and are used for loading/offloading rolling stock.

A

Ground loading ramps

26
Q

________, commonly called “Bridge Plates”, are attached to the end of the aircraft ramp when using the horizontal ramp loading method to load rolling stock from K-loader.

A

Truck loading ramps