ADR full contents Flashcards
1
Q
Part 1
A
General provisions
2
Q
1.1
A
Scope and exemptions
3
Q
1.2
A
Definitions and units of measure
4
Q
1.3
A
Training
5
Q
1.4
A
Obligations
6
Q
1.5
A
Derogations
7
Q
1.6
A
Transitional measures
8
Q
1.7
A
Provisions for radioactive
9
Q
1.8
A
Checks and support measures
10
Q
1.9
A
Tunnel restrictions
11
Q
1.10
A
Security
12
Q
Part 2
A
Classification
13
Q
2.3
A
Test methods
14
Q
Part 3
A
Dg list
15
Q
3.3
A
Special provions
16
Q
3.4
A
LQ
17
Q
3.5
A
Excepted quantities
18
Q
Part 4
A
Use of packaging
19
Q
4.2
A
Use of portable tanks and megcs
20
Q
4.3
A
Use of adr tanks
21
Q
4.4
A
Use of frp tanks and swap bodies
22
Q
4.5
A
Use of vacuum operated waste tanks
23
Q
4.7
A
Use of memus
24
Q
Part 5
A
Consignment procedures
25
5.2
Marking and labelling
26
5.3
Placarding
27
5.4
Documentation
28
5.5
SP for marking and labelling
29
Part 6
Construction and testing
30
6.1
Construction and testing of packaging
31
6.2
Construction and testing of pressure receptacles
32
6.3
Construction and testing of class 6.2
33
6.4
Construction and testing for class 7
34
6.5
Construction and testing of IBCs
35
6.6
Construction and testing of LPs
36
6.7
Construction and testing of portable tanks
37
6.8
Construction and testing of fixed tanks
38
6.9
Construction and testing of FRP tanks
39
Part 7
Carriage loading and handling
40
7.1
Handling for temperature control
41
7.2
V & W loading provisions
42
7.3
Handling for bulk
43
7.4
Handling for tanks
44
7.5
Mixed loading
45
Part 8
Transport equipment and operations