Admin Flashcards

0
Q

Process to determine the amount and type of work to be performed and the qualities of material, labor and equipment needed

A

Estimating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

The process to determine requirements and to devise and develop methods and schemes of action for construction of a project

A

Construction estimating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Consist of the sum of labor, materials, and subcontract cost to arrive at the total estimate ______

A

Total cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the five parts of a drawing?

A
Tile block
Grid system 
Revision block
Notes and legends
Drawing (graphic portion)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How do you determine the number of board feet in a piece of lumber?

A

Thickness (in)x width (in)x Length(ft)/12——–“length(in)/144

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Iaw Niosh, under ideal conditions, what is the max weight to be lifted with two hands by and one person?

A

51 pounds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What six sections is the pms manual broken down into?

A
Maintence Schedule
Record of changes
Letter of promulgation
Unit distribution
System description
PMS procedures index
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does CMPLUS stand for?

A

Configuration management plus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the two major types of maintenance?

A

Corrective and preventative

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

IAW an MPC card under the APL section (allowance parts list)where can information for the number of the item be found?

A

MICA manual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When is the first quarter of for the PMS and fiscal schedule?

A

Oct-Dec

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

As per NEM, COMDINST M9000.6 CH 090, what are the PMS completion % defined as?

A

Number of completed m,q,sa,a,c and hourly maintenance/ number of procedures scheduled for reporting period X 100

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What does SWBS stand for?

A

Ships work breakdown structure?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

In areas where NSTM and NEM conflict, what takes precedence?

A

NEM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What manual contains detailed supply and technical info on every piece of equipment attached to a specific unit?

A

MICA( management info for configuration and allowance) manual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are two types of procedures that may be accessed from the maintenance procedure option?

A

Official and local

16
Q

What main task are associated with creating a local PMS procedure?

A

Determine action, attached CI’s/parts/personnel, create local master task, save data

17
Q

Where do all suggested changes to a maintenance procedure get routed?

A

ELC(Engineering Logistics Command

18
Q

What level are Master Task changed at?

A

Unit Level

19
Q

What are CMA’s used for?

A

Used to record and update unscheduled maintenance repairs and casualties

20
Q

What are the NAVY 2-KILO/ SHIPS MAINTENANCE ACTION FORM (SMAFS) used for?

A

To report work performed on navy owned equipment.Used to request maintenance assistance from shore side navy locations.

21
Q

What type of maintenance history reports may be created in CMPLUS 5.0?

A
Review task history
History reports
Maintenance history
Maintenance summary report
Cutter engineering reports
SMP completion 
quarterly maintenance
22
Q

What is indicated by the first component of the serial number of an MPC card?

A

System specific maintenance procedure belongs to

23
Q

A typical written statement will include the project ______?

A

Materials, Equipment, manpower and cost