Process to determine the amount and type of work to be performed and the qualities of material, labor and equipment needed
Estimating
The process to determine requirements and to devise and develop methods and schemes of action for construction of a project
Construction estimating
Consist of the sum of labor, materials, and subcontract cost to arrive at the total estimate ______
Total cost
What are the five parts of a drawing?
Tile block Grid system Revision block Notes and legends Drawing (graphic portion)
How do you determine the number of board feet in a piece of lumber?
Thickness (in)x width (in)x Length(ft)/12——–“length(in)/144
Iaw Niosh, under ideal conditions, what is the max weight to be lifted with two hands by and one person?
51 pounds
What six sections is the pms manual broken down into?
Maintence Schedule Record of changes Letter of promulgation Unit distribution System description PMS procedures index
What does CMPLUS stand for?
Configuration management plus
What are the two major types of maintenance?
Corrective and preventative
IAW an MPC card under the APL section (allowance parts list)where can information for the number of the item be found?
MICA manual
When is the first quarter of for the PMS and fiscal schedule?
Oct-Dec
As per NEM, COMDINST M9000.6 CH 090, what are the PMS completion % defined as?
Number of completed m,q,sa,a,c and hourly maintenance/ number of procedures scheduled for reporting period X 100
What does SWBS stand for?
Ships work breakdown structure?
In areas where NSTM and NEM conflict, what takes precedence?
NEM
What manual contains detailed supply and technical info on every piece of equipment attached to a specific unit?
MICA( management info for configuration and allowance) manual