Action Taken (AT) Flashcards
BCM 1 -
Repair Not Authorized, (no 1 here may touch it)
BCM 2 -
Lack of Equipment, Tools(2Ls), or Facilities
BCM 3 -
Lack of Technical Skills (i only have 3 skills)
BCM 4 -
Lack of Parts (wished 4 parts)
BCM 5 -
Fails Check and Test (malfunction, need input)johnny5
BCM 6 -
Lack of Technical Data (devil in the details 666)
BCM 7 -
Beyond Authorized Repair Depth (7 “not authorized”)
BCM 8 -
Administr8tive
BCM 9 -
Condemned (Nein! it’s condemned)
Items of Repairable Material, Weapon or Support System Discrepancy Checked No Repair Required.
A (AAAAAA….no problem)
Repair or Replacement of Items.
B (repair of items is a total B)
Removed
P (remove your Pness)
Failure of Items Undergoing Check and Test.
F (Ffffailure) only Friends in other work center can Fail it
Repair
C (repair is Cool)
Calibrated - No Adjustment Required.
J (Just fine)
Fiber Optic Line Repaired Utilizing Splicing.
I (splice this line)
Fiber Optic Line Repaired Utilizing Termini Repair Procedure
H (H looks more complicated than I)
Work Stoppage, Post and Predeployment, and Intermediate Maintenance Activity (IMA) Support
D (someone took their D out, work stops, sent away, closed out)
Calibrated - Adjustment Required
K (m’Kay you’ll need to calibrate)
Work In-Progress - Close out
N
Work Stoppage - Awaiting Parts
L (Low on parts)
Installed
Q (QA might check your installation)
Remove and Replace
R
Remove and Reinstall
S
Removed and Replaced for Cannibalization
T
Troubleshooting
Y (Y isn’t it working)
CorrosionTreatment
Z (don’t be laZy with corrosion)
Phase and Special inspections, Corrosion Preservation and Depreservation
0
Spare Fiber Optic Segment Used from Within Cable Assembly to Repair Aircraft Discrepancy
G (gee, i hope this spare works)