Acryonyms 2 Flashcards

1
Q

HDS

A

Hydrodynamic Separation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

HR

A

Human Resources

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

IBC

A

Inside Bridge Consultant

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

ISC

A

Inside Sales Coordinator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

JIS

A

Job Information Sheet (Document used to collect customer information used at time of order)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

LID

A

Low Impact Development

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

LOI

A

Letter of Intent to Purchase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

LTL

A

Less than Truck Load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

MRP

A

Material or Manufacturing Requirements Planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

MTO

A

Made-to-Order

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

M5

A

Metric Sheeting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

MSE

A

Mechanically Stabilized Earth Wall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

NPD

A

New Product Development

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

PL

A

Product Leaders (Structures)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

PB

A

Project Buyer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

PC

A

Project Coordinator (Stormwater: manages fulfilled orders based on product to delivery with customer)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

PDW

A

Product Design Worksheet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

PIF

A

Project Information FOrm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

PM

A

Product Manager or Plant Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

PreCon

A

Pre Construction Meeting (Meeting with contractor that will be installing Contech product(s) and others associated with project. Purpose is to review specific installation and application requirements)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

PO

A

Purchase Order (a written agreement received from a customer that describes the conditions by which the customer will order materials or services. Careful consideration of the terms and conditions of the purchase order must be made per policies)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

POD

A

Proof Delivery

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

PPD

A

Prepaid (freight term)

24
Q

PPAD

A

Prepaid at Port (freight term)

25
Q

PPA

A

Prepay and Add (freight term)

26
Q

PPAP

A

Prepay and Add at Port (freight term)

27
Q

PSR

A

Project Status Report

28
Q

RCP

A

Reinforced Concrete Pipe

29
Q

RDD

A

Requested Delivery Date (Contractor’s expected deliver date)

30
Q

RRDD

A

Revised REq. Delivery Date (Revised date provided by contractor during or post-production.

31
Q

RD

A

Regional Director

32
Q

RE

A

Region Engineer (Pipe and Stormwater)

33
Q

RRM

A

Regional Regulatory Manager

34
Q

RTM

A

Release to Manufacture

35
Q

RPM

A

Regional Precast Manager

36
Q

SG

A

Secondary Galv, some sort of issue with the coil, could be visual, sag lines etc., abnormal gage thickness, or coating issues with flaking and peeling or even bare spots. Domestic source, usually do not have certs with secondary

37
Q

SAW

A

Solutions Assessment Worksheet

38
Q

SDE

A

Stormwater Design Engineer

39
Q

SE

A

Sales Engineer

40
Q

SEA

A

Sales Engineer Associate

41
Q

SET

A

Safety End Treatment

42
Q

SMART

A

Specific, Measurable, Attainable, Relevent and Timebound goals

43
Q

SMI

A

Slow moving inventory, Inventory has 4 groups, A, C, S, and D.

  • A items : M5 stockings items
  • C items: Made to order (MTO) items
  • S items: Not an A item & has had no activity (invoicing, production, receiving) for at least 6 months but some activity in the last 15 months.
  • D items : No activity on that part # for the last 15 months.
44
Q

SOP

A

Standard Operating Procedure

45
Q

SRPE

A

Steel Reinforced Polyethylene Pipe

46
Q

SS

A

Super Span

47
Q

SURF

A

System User Request FOrm (IT form)

48
Q

SWC

A

Stormwater Consultant

49
Q

SWOT

A

Strengths, Weaknesses, Opportunities and Threats analysis

50
Q

TC

A

Truss Consultant

51
Q

TIPC

A

Truss Inside Project Consultant

52
Q

TLP

A

Tunnel Liner Plate

53
Q

UF

A

Ultra Flo Pipe

54
Q

UOM

A

Unit of Measure

55
Q

VE

A

Value Engineering