ACRONYMS Flashcards

1
Q

CIRT

A

Confirmed issue resolution tracker

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

FWT

A

Factory Witness Test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

IST

A

Integrated Systems Test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

DSI

A

Design Systems Integrator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

CSI

A

Construction Systems Integrator

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

EPMS

A

Electrical Power Management System - (form of SCADA) Telecom, power utilities, water, waste control, energy, oil, gas refining

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

ETL

A

Equipment Tracking Log

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

FACNet

A

Facility Network

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

EOR

A

Engineer of Record

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

SCADA

A

Supervisory Control and Data Acquisition - Used for monitoring and controlling equipment w/ critical and time sensitive equipment (using PLCs). Used for data acquisition, network data comm., data presentation, control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

DCIM

A

Data Center Infrastructure Management - Manage monitor, measure, control data center utilization and energy consumption of IT related equipment (storage, network switch, servers), PDUs (power distribution units)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

CPMS

A

Critical Power monitoring System - Manage critical power generation and distribution - gen-sets, circuit breakers, transfer switches, bus bars, parallel control switch gears, UPS’, etc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

CMOP

A

Contractor Method of Procedure - submitted via E-Builder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

L1 - L5

A

Phases of Facebook Data Center to turnover a space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

L1

A

FWT and bench tests
i. ATS - PTP, Alarm, trend, SOO, graphic checklist depending on system
ii. Done on all 1st of kind code and graphics - identify issues early on
iii. (2) Weeks - 1st led by CSI, 2nd - led by CxA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

L2

A

sub install and wiring
i. ATS - confirm completion of subcontractor checklists

17
Q

L3

A

CSI confirming operations of equipment and systems to contractual specs
i. Starts @ power on of device
ii. Complete graphics, alarm, trend, SOO checklist

18
Q

L4

A

CxA, aid int testing

19
Q

L5

A

IST - Integrated Systems Test - extra level of commissioning

20
Q

VESDA

A

Fire Very Early Smoke Detection Apparatus - Suppression System

21
Q

ATS

A

Automatic Transfer Switch

22
Q

VRF

A

Variable Refrigerant Flow

23
Q

CRAH

A

Computer Room Air Handler (CHW)

24
Q

CRAC

A

Computer Room Air Conditioner - Refrigerant

25
Q

Smart Gas Analyzer

A

N2 Concentration

26
Q

MSB

A

Main Switchboard - Electrical switching

27
Q

MSG

A

Main Switch Gear

28
Q

LCP

A

Liquid Cooling Package

29
Q

MER

A

Modular electrical room

30
Q

Hyperscale

A

the complete mix of hardware and facilities that can scale a distributed computing environment up to thousands of servers. As its name implies, hyperscale is all about achieving massive scale in computing—typically for big data or cloud computing. Hyperscale infrastructure is designed for horizontal scalability and leads to high levels of performance, throughput, and redundancy to enable fault tolerance and high availability