A 6 by 12 in cylinder mold can be used for concrete containing aggregate with particles not exceeding
_____ in size, without the need for wet sieving the concrete.
2 inch
According to ASTM C1064, what is one reason to take the temperature of concrete?
Verify conformance to a specified requirement for temperature of concrete
After completing the strike-off procedure, what must be dont before weighing the measure and sample?
Clean off any excess concrete
After consolidation of the final layer, an excess of concrete ___ above the top of the measure is considered optimum.
1/8 inch
After molding test specimens, you should wait two hours before moving them to the location of initial storage. True or False?
False, the specimens must be moved within 15 minutes
After rodding each layer, what should be done to the measure before adding another layer of concrete?
Tap the sides of the measure smartly 10 to 15 times with the mallet
After final rodding, the sides of the slump mold should be tapped lightly with the tamping rod. True or False?
False
After the temperature of the concrete is read, what is required?
Reporting of temperature, record it, sun, wind, contamination
Air meter bowls used for this test must conform to ASTM ___ and be calibrated for volume according to ASTM ___.
C231, C29
The approximate concrete depth (in vertical distance) after placing the first layer is ___, and the second layer is ___.
2 5/8 inch, 6 1/8 inch
ASTM Method gives standardized requirements for ___, ___, ___, and ___, of test specimens.
making, curing, protecting, transporting
At the end of the procedure, the air meter is ___.
Disassembled and its contents examined
The composite sample for a paving mixer must represent a minimum of ___ different portions of the batch of concrete taken from the pile after discharge.
5
A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True or False
False
The composite samples from a truck mixer must be obtained from the portion from the ___ portion of the batch
middle
Concrete mixtures with specified strengths of 6000 psi or greater shall have initial curing temperature between ___.
68 and 78 degress F
The concrete sample must be obtained in accordance with what ASTM method?
C172
The concrete sample must be protected from contamination and ___.
Rapid evaporation
Concrete samples from a truck mixer must be obtained before any water or admixture are added to the mixer at the job site. True or False?
False
The container for obtaining the concrete sample used in this procedure can be a ___, ___, or ___.
Metal pan, wheelbarrow, flat, clean nonabsorbent mixing board
Cylinders made for the purpose of determining when a structure may be put into service shall be removed from the mold ___.
At the time of the removal of formwork
Cylinders that are to be field cured are stored ___ and protected ___.
In or on the structure as near to the point of deposit of the concrete represented as possible; In as near as possible the same way as the formed work
The diameter of the tamping rod used in the test method is ___.
5/8 inch except 4” x 8” cylinders
The direct reading of the final liquid level in the neck of the air meter, is estimated to the nearest ___.
0.25 %
During transportation, test specimens must be protected from damage due to ___, ___, and ___.
Jarring, freezing temperatures, moisture loss
Each layer should fill approximately ___ the volume of the mold
One-third
Field Curing is the curing method used when test specimens are to be used for ___.
Determination of whether the structure is capable of being put into service; Comparison with standard cured specimens test results or with results from various in-place test methods; Adequacy of curing and protection of concrete in the Structure, or Form or shoring removal time requirements.
For a measure of 0.5 ft^3 [14 L], what is the required number of strokes of the tamping rof for consolidation of each layer?
25
For concrete with a slump less than 1 inch [25 mm], the test specimens must be consolidated by ___.
Vibration
For cylinders with a diameter of 6 inch [150 mm] or greater, the tamping rod must be a round, straight steel rod with diameter of ___.
5/8 +- 1/16 inch [16 mm +-2mm] 4 inch longer than cylinder. 24 inch maximum
For use in the slump test, the end of both ends of the tamping rod must be ___.
Rounded to a hemispherical tip
The height of the slump mold is ___.
12 inches [300 mm]
How deep should the tamping rod penetrate into each layer?
Rod each layer throughout its depth; on the second and final layers, the rod should penetrate into the previous layer approximately 1 inch [25 mm]
How long must the temperature measuring device remain in the freshly mixed concrete?
At least 2 minutes but not more than 5 minutes
How long should the air meter be inverted and agitated?
No more than five seconds at a time but must be repeated for a minimum of 45 seconds to free concrete from the base
How many times does the rolling operation occur?
A minimum of 2, a maximum of 3
How much time is allowed for lifting the slump mold?
5 +- 2 seconds
How much time is allowed to conduct the slump test from beginning to completion?
2 1/2 minutes
If, after consolidation of the final layer, the concrete level is 1/2 in. [13 mm] above the top of the measure, what should be done?
Remove a representative portion of the excess concrete with a trowel or scoop to 1/8” optimum
If less than 2.5 pints of alcohol are used, the air content is always indicated by the final meter reading. True or False?
False, if the air content is more than 9%, the number of calibrated cups of water introduced into the meter to bring the liquid level within the graduated range must be added
If more than 2.5 pints of alcohol are used, the final meter reading is always adjusted using ___.
A correction factor
If portions of undisturbed concrete are found in the air meter at the end of the test, ___.
The test is invalid
If rodding is the method of consolidation being used, the measure must be filled in how many layers?
3
If the air content is greater than the 9% range of the meter, ___.
Calibrated cups of water are added to bring the liquid level within the graduated range
if the concrete contains aggregate larger than the maximum allowed for this test, the sample must be
Wet sieved over a 1 1/2 inch [37.5 mm] sieve
If the concrete is to be consolidated by vibration, a standard 4 by 8 in. [100 mm by 200 mm] cylinder mold must be filled in ___ equal layers.
2
If the concrete sample contains aggregate larger than that allowed for this test, the sample must be ___.
Wet seived over a 1 in. [25 mm] sieve
If the concrete sample is to be consolidated by rodding, the measure is filled in ___ layers.
3 equal
If the concrete sample is to be consolidated by vibration, the measure is filled in ___ layers.
2 equal
If vibration is the method of consolidation, the measure must be filled in ___ approximately equal layers
2
The initial quantity of water and alcohol added to the air meter can be poured directly into the neck of the top section of the air meter. True or false?
False; the funnel must be used
In order for an initial meter reading to be valid, the meter must not be leaking, the liquid level must stabilize within 6 minutes and the foam on the surface of the liquid must not be greater than 2 full percent divisions. True or false?
True
In rodding the sample, how deep should the rod penetrate each layer?
Rod bottom to full depth; rod second and final layer penetrating the previous layer about 1 in. [25 mm]
The interior surface of the slump mold is allowed to have minor irregularities. True or false?
False
It is necessary to tap the sides of the bowl after each layer has been rodded. True or false?
True
A mallet weighing ___ must be used to tap the sides of the bowl after rodding each layer.
1.25 +- 0.50 lb [600 +-200g]