A 6 by 12 in cylinder mold can be used for concrete containing aggregate with particles not exceeding
_____ in size, without the need for wet sieving the concrete.
2 inch
According to ASTM C1064, what is one reason to take the temperature of concrete?
Verify conformance to a specified requirement for temperature of concrete
After completing the strike-off procedure, what must be dont before weighing the measure and sample?
Clean off any excess concrete
After consolidation of the final layer, an excess of concrete ___ above the top of the measure is considered optimum.
1/8 inch
After molding test specimens, you should wait two hours before moving them to the location of initial storage. True or False?
False, the specimens must be moved within 15 minutes
After rodding each layer, what should be done to the measure before adding another layer of concrete?
Tap the sides of the measure smartly 10 to 15 times with the mallet
After final rodding, the sides of the slump mold should be tapped lightly with the tamping rod. True or False?
False
After the temperature of the concrete is read, what is required?
Reporting of temperature, record it, sun, wind, contamination
Air meter bowls used for this test must conform to ASTM ___ and be calibrated for volume according to ASTM ___.
C231, C29
The approximate concrete depth (in vertical distance) after placing the first layer is ___, and the second layer is ___.
2 5/8 inch, 6 1/8 inch
ASTM Method gives standardized requirements for ___, ___, ___, and ___, of test specimens.
making, curing, protecting, transporting
At the end of the procedure, the air meter is ___.
Disassembled and its contents examined
The composite sample for a paving mixer must represent a minimum of ___ different portions of the batch of concrete taken from the pile after discharge.
5
A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True or False
False
The composite samples from a truck mixer must be obtained from the portion from the ___ portion of the batch
middle
Concrete mixtures with specified strengths of 6000 psi or greater shall have initial curing temperature between ___.
68 and 78 degress F
The concrete sample must be obtained in accordance with what ASTM method?
C172
The concrete sample must be protected from contamination and ___.
Rapid evaporation
Concrete samples from a truck mixer must be obtained before any water or admixture are added to the mixer at the job site. True or False?
False
The container for obtaining the concrete sample used in this procedure can be a ___, ___, or ___.
Metal pan, wheelbarrow, flat, clean nonabsorbent mixing board
Cylinders made for the purpose of determining when a structure may be put into service shall be removed from the mold ___.
At the time of the removal of formwork
Cylinders that are to be field cured are stored ___ and protected ___.
In or on the structure as near to the point of deposit of the concrete represented as possible; In as near as possible the same way as the formed work
The diameter of the tamping rod used in the test method is ___.
5/8 inch except 4” x 8” cylinders
The direct reading of the final liquid level in the neck of the air meter, is estimated to the nearest ___.
0.25 %