ACI Class Flashcards
What must occur before a sample of concrete can be taken from a revolving drum mixer?
All water and admixtures must be added to the mixer.
When sampling from a stationary or revolving drum mixer, what is collected and when is it taken during discharge?
• In two or more portions of concrete
• At regularly spaced intervals
• From the middle of the batch
How are the sample portions obtained from the discharge stream of a stationary or revolving drum mixer?
• Repeatedly pass a receptacle through the entire discharge stream
• Completely divert the discharge stream into a sample container
Describe the procedure for collecting a sample from a paving mixer.
• discharge the contents of the paving mixer
• obtain samples from at least five different portions of the pile
What is the minimum size for a sample when strength test specimens are to be molded?
1 cu.ft [28 L]
What is the maximum allowable time between obtaining the first and final portions of the composite sample?
• 15 min
What action is required after the individual concrete samples have been transported to the place where tests are to be performed?
• Combine and remix the samples with a shovel
What should be done if the concrete contains aggregate larger than is appropriate for the size of the molds or equipment being used?
• Wet sieving (screening)
Start the tests for slump, temperature, and air content within how many minutes after obtaining the final portion of the composite sample?
5 min
Start molding specimens for strength tests within how many minutes after fabricating the composite sample?
• 15 min
From what must a concrete sample be protected?
• sun, wind, and rapid evaporation
• contamination