AC Power Supply Systems Flashcards

1
Q

Twin freq wild system

A

Comes form 2 engines

2 separate bus bars

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Constant freq systems can be subdivided into

A

Spilt busbar systems

Parallel busbar systems

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Before external power can be applied it is checked for

A

Correct voltage
Correct freq (400Hz)
Correct freq ABC
No other power sources feeding AC busbar (dead busbar sensing)

Can’t have ships power and external power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

GCU houses

A

Generator control unit

Houses - voltage regulator,freq control, protection circuits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Differential protection

A

Hoops transformers will isolate the AC generators if the differential fault occurs - gets grounded

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

GCB

A

Connects generator to its individual busbar

Big switch, mechanically latched

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

BTB

A

Bus tie breakers - tie each busbar to each other - connects them together

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

GFR

A

Generator field relay - generates current to the exciter - generator on/off switch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Spilt busbar has no paralleling

A

AC power

Source of the system does not enter automatically - when it reaches the correct voltage and frequency - must be manually switched on

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Spilt busbar system - what takes priority

A

Source AC power being connected to a generator bus takes priority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly