A/M26U-14 Flashcards

1
Q

Each Cylinder is capable of holding ___ cubic feet of gas at ____ psig.

A

400, 2,400psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The purpose of the oxygen servicing trailer is to

A

replenish aircraft oxygen storage cylinders and emergency bailout systems.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The O2 Cart has ____ Static Discharge Reels and are used to ground the O2 Cart.

A

two

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Low Pressure Adapter Rupture Disc will burst at approximately ____ psig

A

600

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

High Pressure Adapter Rupture Disc will burst at approximately _____ psig

A

2400

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

O2 Cart weight (with Oxygen cylinders)

A

Approx 2,096 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Servicing Hose Length

A

50 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

pre-operational inspection

A

NAVAIR 19-600-37OS-6-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

O2 Cart shall be kept a minimum of ____ from aircraft, vehicles, roadways, and wooden structures.

A

50 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Maintain gas cylinders at a minimum pressure of ____ to prevent accumulation of moisture within cylinder.

A

25 PSIG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Maintenance Requirements Cards

A

NAVAIR 19-600- 37OS -6-2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Tow the O2 Cart to within ____ feet of the component to be serviced.

A

30 - 40

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

______ allow for recharging all six Cylinders simultaneously and prevent cascading between Cylinders during normal servicing operations

A

Check valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

During recharging, gas flows through the Recharge ____ and Recharge ____ into the ____ Cascade Manifold, through the ____ Valves, into the Upper ___ ___ then out to the ___ ___ and directly into all six Cylinders simultaneously. Cylinder pressure can be monitored on any of the six 0–3000 PSI Gauges in the Upper Cascade Manifold.

A

Valve, Filter, Lower, Check, Cascade Manifold, Cylinder Valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly