7-Production, Utilization & Disposal Flashcards

1
Q

Construction

A

1-previous to construction we have to finished detailed design with all required artifact to be built.
2-In parallel with design, production specialists and integrated logistics support specialist work with engineers to ensure the design is realizable.
3-Planning the construction effort. Resources, workload, construction order, etc.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Tests during construction

A
1-inspections
2-analyses (doc.vs result)
3-tests (results vs expected results)
4-demonstrations
5-configuration audit
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Transition

A

1-checking lifecycle concepts
2-training (training teams, users, maintenance and support teams)
3-manuals and operations guides
4-consumables, spare parts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Utilization

A

1-Operational
2-Maintenance support
3-modification (System Engineering effort). Good design minimize this effort.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why modifications?

A

1-Environment changes
2-Requirements changed
3-Improvements or enhancements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Disposal

A

1-sell on
2-destroy, scrap and recycle
3-other use
4-be careful with hazardous materials or very sensitive information