7-Production, Utilization & Disposal Flashcards
Construction
1-previous to construction we have to finished detailed design with all required artifact to be built.
2-In parallel with design, production specialists and integrated logistics support specialist work with engineers to ensure the design is realizable.
3-Planning the construction effort. Resources, workload, construction order, etc.
Tests during construction
1-inspections 2-analyses (doc.vs result) 3-tests (results vs expected results) 4-demonstrations 5-configuration audit
Transition
1-checking lifecycle concepts
2-training (training teams, users, maintenance and support teams)
3-manuals and operations guides
4-consumables, spare parts
Utilization
1-Operational
2-Maintenance support
3-modification (System Engineering effort). Good design minimize this effort.
Why modifications?
1-Environment changes
2-Requirements changed
3-Improvements or enhancements
Disposal
1-sell on
2-destroy, scrap and recycle
3-other use
4-be careful with hazardous materials or very sensitive information