6.5. Majcom Responsibilities Flashcards
1
Q
- During the annual validation, who will add , change , or delete authorizations based on various factors such as mission change requirements or asset availability?
A
MAJCOM/A4 RSP Managers
2
Q
- Whose responsibility is it to manage RSP at the base level?
A
LRS/MATERIAL MANAGEMENT ACTIVITY
3
Q
- If an RSP needs to be replenished, Base-level RSP personnel will process ____ to refill the on-hand quantity.
A
TRIC: ISU KIT
4
Q
- Wich RSP can be comingled with POS stock?
A
In-Placed Readiness Spares Packages
5
Q
- Wich package must be stored separately and secured from all other assets?
A
MRSP
6
Q
- Within what timeframe does an RSP or MSK need to be inventoried after returning from deployment?
A
Ten days
7
Q
- Name the listings used to manage RSP assets.
A
•MRSP (R43)
• MSK (R50)
• NAMRSP (R52)
• IRSP (R63)