API 510 says that widely scattered pitting can be ignored provided that the:
A. Pit depth is less than 1/2 the minimum required thickness
B. Pit depth is less than 1/2 the vessel current thickness away from the pit
C. Remaining thickness is not less than 1/2 the minimum required thickness
D. Remaining thickness is not less than 1/2 the current thickness away from the pit
C. Remaining thickness is not less than 1/2 the minimum required thickness
Rupture disks are commonly used:
A. When back pressures are variable
B. For steam and air service
C. When the operation pressure is close to set pressure
D. To protect a pressure relief valve from corrosive products
D. To protect a pressure relief valve from corrosive products
After a vessel alteration a 1 inch thick vessel weld is radiographs. The correct hole type IQI is used. When the film is reviewed, which of the following would cause the film to be rejected?
A.A faint light “B” is seen in the film
B. A faint dark”B” is seen in the film
C. The 1T hole is not visible
D. The minimum film density in the weld is 1.7
E. The maximum film density in the weld is 3.4
A. A faint light “B” is seen in the film
D. The minimum film density in the weld is 1.7
Which code provides requirements for hot tapping
A.API 578
B. API 579
C. API 651
D. API 2201
E. API 2217
D. API 2201
Ensuring tightness of box distributor hardware in a column is most commonly done by
A. Lift testing
B. Rattling the hardware
C. Torque testing
D. UT
B. Rattling the hardware
The maximum inspection interval for a pressure relief device in normal service is based on:
A. The lesser of 1/2 remaining life or 10 years
B. Acceptable performance of the device
C. Acceptable performance of the device with a maximum interval of 5 year
D. Acceptable performance of the device with a maximum interval of 10 year
C. Acceptable performance of the device with a maximum interval of 5 year
A carbon steel vessel in caustic service has a temperature excursion up to 425°F. No PWHT has been performed. What type of deterioration could be expected?
A. Intergranular corrosion
B. Stress corrosion cracking
C. Galvanic corrosion
D. High temperature embrittlement
B. Stress corrosion cracking
During a vessel repair or alteration, when can control deposition welding be used as an alternative for postwar heat treating?
A. For P-1 & P3 materials
B. For P1, P3 & P4 materials
C. For P3, P4 and P5 materials
D. For P1 through P11 materials
E. Whenever the inspector reviews and approves the procedure
B. For P1, P3 & P4 materials
All RBI assessments must be:
A. Throughly documented
B. Repeated every 5 years
C. Approved only by the authorized inspector
D. Conducted per guidelines in API 579
A. Throughly documented
What inspection tool can be used to measure the weld pre angle gap?
A. Bridge cam gauge
B. See Bleistift gauge
C. Hi-Lo gauge
D. Pyrometer
E Skew gauge
A. Bridge cam gauge
Which of the following activities are included int the scope of API 510? (Choose all that apply)
A. Rerating a vessel
B. Operating a vessel
C. Replacing a vessel head
D. Internally inspecting a vessel
A. Rerating a vessel
C. Replacing a vessel head
D. Internally inspecting a vessel
Which type of corrosion is most easily missed by a visual examination?
A. Pitting
B. Localized thinning
C. Uniform corrosion
D. Preferential corrosion at welds
C. Uniform corrosion
The maximum allowable working pressure of a vessel is the:
A. Vessels design pressure
B. Vessels designed pressure plus the hydrostatic head
C. Maximum pressure permitted at the top of the vessel
D. Maximum pressure permitted at the vessel bottom which includes hydrostatic head
C. Maximum pressure permitted at the top of the vessel
The use of a fillet weld patch on a vessel‘s shell requires approval from the:
A. Authorized inspector
B. Pressure equipment engineer
C. Authorized inspector and the pressure equipment engineer
D. Owner/user and pressure equipment engineer
C. Authorize inspector and the pressure equipment engineer
During alterations, fabrication approvals( hold points) shall be designated by:
A. The authorize inspector
B. The pressure vessel engineer
C. Both authorize inspector and the pressure vessel engineer
D. Either the authorize inspector or the pressure vessel engineer
A. The authorize inspector