4503 Flashcards

1
Q

For RCS Flow instrumentation, how many pressure tapes on the LP Side?

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

For RCS Flow instrumentation, how many pressure taps are on the high pressure side?

A

1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If a leak develops on the high pressure tap for RCS Flow instrumentation, what does indication do?

A

The DP is smaller, so flow looks lower

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How do you find core uncovery time?

A

Add both curves! Time to Boil + Uncovery

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the RCS Heat up limit?

A

60 degrees per hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the RCS Cooldown limit?

A

100 degrees per hour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How do RHR Hx Outlet valves IRV-310 and IRV-320 fail on a loss of control air?

A

Open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How does the RHR Hx Bypass valve, IRV-311 fail on a loss of Control Air?

A

Open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How does the RHR LD valve, IRV-300 fail on a loss of control air?

A

Closed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which RHR Motor Ops can be used to control temperature if control air is lost?

A

ICM-311 and ICM-321

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When in an ATWS (FR-S-1), when should RCPs be tripped?

A

Only when <5% power!

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the unit differences for RWST Freeze protection?

A

Unit 1 is heat traced

Unit 2 has a pump and heater

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the minimum temperature for criticality?

A

If < 541 degrees for 30 mins, Trip

If < 539 degrees, Trip immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What Loop and Leg does Normal charging go into

A

Loop 4, CL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What loop and leg is excess LD on?

A

Loop 4 CL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What loop and Leg is Normal LD on?

A

Loop 4 intermediate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What Loop and Leg is Alt Charging on?

A

Loop 1 CL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What loop and leg is RHR Suction on?

A

Loop 2 HL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

How long of a time delay is there on a MFP Trip on low suction pressure?

A

5 seconds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What are the inputs to the sub cooling meter?

A

(5) Auctioneered High CETs or RVLIS WR Pressure

Auctioneered LOW RVLIS Pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Why is RVLIS Pressure Instrumentation desired as an input to the SC Meter?

A

Located outside of containment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is the required RCS Leakage Detection Instrumentation per TS 3.4.15?

A

Containment sump monitor in each sump

1 containment atmosphere particulate rad monitor

1 containment atmosphere gaseous rad monitor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are the RCS Flow related Rx Trips?

A

RCS Loss of Flow

UV RCP Busses

UF RCP Busses

RCP Breaker Position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

When do you use NR RVLIS?

A

NO RCPS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

When do you use WR RVLIS?

A

WITH RCPs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

When do you use Upper Plenum RVLIS?

A

All RCPs Off

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

Which RCS Signal feeds directly into RIL Computer logic?

A

Auctioneered RCS Delta T

28
Q

In excessive RCS Leakage AOP, which 3 conditions require a reactor trip?

A
  1. PRZ Level cannot be maintained w 2 CCPs (w LD Isolated)
  2. Containment pressure ~1 psi
  3. VCT Level cannot be maintained.
29
Q

During a mode 4 Loca, what order is preferred to depressurization RCS to refill PZR?

A
  1. Normal Spray
  2. PRZ PORV
  3. Aux Spray
30
Q

What is the overall strategy for injecting water into the RCS during a mode 4 loca?

A

Add 1 sources at a time, checking to see if PRZ Level and subcooling parameters are met before going to next source

31
Q

Why not just inject everything you have at the same time in a mode 4 loca?

A

Too much water could result in solid RCS w large pressure transient that could cause an integrity issue

32
Q

Will cross tying the SFP Hx prevent the SFP from boiling?

A

NO, just delays the time to boil

33
Q

What is required for an irradiated fuel handling accident in the SFP area with no refueling activities in containment?

A

CR Notification

34
Q

How is containment cooling provided w the loss of offsite power?

A

NESW via open cycle

35
Q

If the TDAFP receives an auto start signal as part of a planned reactor trip, is it reportable?

36
Q

RCS Flow should be maintained greater than 2400 gpm on IFI-311/321 OR > 3100 gpm on IFI-335. Why?

A

Ensure required mixing sot that a dilution event can be recognized

37
Q

To help prevent surge line temp transients, net charging flow shall be limited to _____ with RCS Temp < 310 degrees

38
Q

To help prevent surge line temp transients, net charging flow shall be limited to _____ with RCS Temp >310 degrees

39
Q

During a heat up, why must control and shutdown rods not be energized until Tavg is > 500 Degrees?

A

Prevents a possible lockup situation due to thermal expansion or contraction of the rods and the CRDM

40
Q

What can cause Actual Critical Rod Position to be lower than ECP?

A

Less boron in the core

Steam Pressure Controller set 5 psi lower than normal

Xenon, depending on core power history and time after shutdown

41
Q

Why do we not use both trains of RHR at reduced inventory?

A

The potential of Air binding would risk damaging both pumps

42
Q

What is required for LTOP w porvs and the suction relief?

A

Either 1 PORV and the suction safety
Or
Both PORVs

43
Q

When in FRS1, why do we verify pzr pressure <2335 psig after commencing emergency boration?

A

To ensure 70 gpm + borates rwst water is injected thru the BIT injection valves

44
Q

Which valve is associated with NPS-121?

45
Q

Which valve is associated with NPS-122?

46
Q

If there is degraded flow in a RCS loop due to a bad rcp impeller, what would be the result of the lowered flow rate?

A

Delta Temp in that loop at full power will be higher

And

The reactor core margin to DNB will be lower

47
Q

If you get a RHR hx tube leak while using that train for shutdown cooling, what is expected?

A

Leaks into CCW. Lowers cavity level and raises CCW surge tank level. Also, less cooling bc that warmer water mixes w CCW

48
Q

While moving fuel, an assembly is dropped in the pool. Bubbles are seen and there is a high rad on r5.

What happens automatically and what needs to be done manually?

A

Auto- fuel handling area supplies trip

Fuel handling charcoal filters were already in service but receive a signal.

Manually place CR pressurization fans in charcoal mode

49
Q

What is the concern with the reactor trip breakers not opening during frs1?

A

FWI signal will not actuate to prevent excessive RCS cooldown from over feeding the SGs

50
Q

What is c20? What does it do?

A

2/2 turbine impulse pressures > 40%

It enables amsac

51
Q

When will you get an amsac actuation?

A

1/1 FW Flows to 3/4 SGs <25% and C20

52
Q

What does an AMSAC initiation do?

A

Turbine trip

Mdafp start
Tdafp start

Afw flow conservation

53
Q

Why is ATWS worse in BOL?

A

More positive MTC, which means less temperature feedback

54
Q

During an ATWS, what 2 concerns are there? And which accidents make them the worst?

A

DNBR concerns from LOOP

RCS overpressure concerns from loss of normal feed water

55
Q

Why is it important to get the turbine tripped in FRS1?

A

Preserve SG inventory for loss of normal FW ATWS

56
Q

What would you expect to be the cause if RHR Amps were very low or even at 0?

A

Sheared shaft

57
Q

What could the cause be of pegged high amps on a RHR pump?

A

Locked rotor

58
Q

In terms of injection flow, what defines a LBLOCA vs a SBLOCA?

A

If RHR is able to inject, then it’s a LB

59
Q

When swapping around RHR, why is the CL isolation valve closed before opening the HL valve?

A

Prevents pump runout

60
Q

When does runout become a concern for the RHR pumps?

A

Flow beyond 4500 gpm

61
Q

What are the RHR interlocks?

A

Yea, look these up asshole. I’m not typing em all out!

62
Q

What are the time limits and reasons. associated w transferring to HL injection?

A

5.5 - 7.5 hours

Low end avoids core uncovery due to boil off

High end prevents boron precipitation

63
Q

What elevation do we not operate RHR below?

64
Q

What will give you a SLI?

A

Low low Tave w high steam flow

High high lower containment pressure 2.8 psi

Low SG pressure <500 psi

65
Q

What are the SG pressures that cause a reactor trip?

A

Unit 1
5%
15 % w high steam flow

Unit 2
22%
26% w high steam flow

66
Q

What are some items that have thermal sleeves?

A

Prz spray and surge lines

Normal and alternate charging lines

RHR/ACCUM/SI Taps