411 Flashcards

1
Q

AUTHORITY

Authority at a hazmat incident is derived from

A

Interagency hazardous materials response

-Which defines the general responsibilities of respondent agency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The Jacksonville fire and rescue department has the authority with a few exceptions to assume command of any hazardous material incident: Exceptions are: 3

A

Marine incident under jurisdiction of the US Coast Guard
Incident on military bases
Nuclear incident such as plane crashes involving nuclear weapons

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The first arriving agency will take command until

A

A more appropriate Coordinator/incident commander arrive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When a call is received indicating a possible hazmat incident if FRCC will attempt to obtain information regarding incident is involved including: 6

A
  • Name
  • Amount
  • Type
  • Size container
  • Type of problem
  • Property Of the reporting material
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Once confirmation of a hazmat incident has been established the IC Will advise if FRCC

A

Make required notifications as needed

EMRD, STATE WARNING POINT, COAST GUARD, DOT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

COMMAND
-Establishing into the command is required by federal law is not an option
Person in charge of the first arriving unit will- established command,And they will advise are responding units with the staging if possible a safer route to the incident location

A

Safety officer must be designated to monitor operations. This is required by federal law is not an option

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

SIZE UP

The critical aspect of the response to A hazmat incident is the

A

Initial size up of the situation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Upon arrival of the first unit, there are certain factors/conditions that must be taken into account before any commitment of Jeopardy personnel. These are: 4

A

-Wind conditions and direction
Topography the incident location
-Area of involvement(open or confined space)
-Type of materials involved (solid, liquid, or vapor)
-Hazards of the materials involved

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The objective of size up is to the following reasons:3

A
  1. Identify product involved
  2. Assess the nature and severity of the problem
  3. Gathered sufficient information to formulate a valid incident action plan
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

HAZARD IDENTIFICATION:
A primary consideration in the size of any hazmat incident is the…..
This is a prime responsibility of the……

A

Identification of materials involved in hazards present

First arriving you

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

To help identify the hazard personnel so check for the following: (6)

A
  • Labels
  • placards
  • Shipping papers
  • Material safety data sheets(MSDS)
  • Find and talk to the driver possible
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

SCENE ASSESSMENT:

Follows size up and consideration of the first arriving company officer should be:

A
  • The need for the hazardous Materials team

- Scene management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

INCIDENT ACTION PLAN:
-Incident action plan begins with a thorough on scene analysis by the first arriving company officer.
-Formulated the incident action plan utilizing the following priorities:
4

A
  1. Safety for jfrd personnel
    - Unless rescue is required that IC should not commit personnel to the hot zone until decontamination capabilities are available
    - Work in pairs
  2. Safety of civilians
    - Begin evacuation/rescue of civilians that are downwind of fumes, vapors, and/or runoff
    - Secure Hazard area with barriers
    - Provide medical assistance As needed
    - Patients May need to be decontaminated for transport
  3. Conservation of property
    - Minimize the amount of property damage
    - Dike for ventilate materials away from persons and property
  4. Control/stabilization of incident
    - Primary effort should Be made to minimize the escape of hazardous materials
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • Direct and run off to a safehold area

- Dissipating Vapors

A

Defensive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • Diluting materials
  • Neutralizing substance
  • Plugging for shutting off leak
A

Offensive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

ZONING

Immediately after identifying the hazard, ___ shall be Established

A

Control zones

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Zoning will be divided into three distinct areas determined by

A

Hazmat team

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Represents A danger to life and health

-It should be imposed with extreme caution

A

Hot zone

19
Q

No personnel or equipment would leave the hot zone without

A

Going through the decontamination process

20
Q

___ ___ Will be restricted to essential personnel and equipment only
-Provides for designated entry point to the hot zone and a designated exit route Through a decontamination station

A

Warm zone

21
Q

This is a safe area were all supporting personnel, assisting agencies, staging, equipment, and IC are located

A

Code zone

22
Q

Decontamination

Success of Decon, like that of any operation, is based on

A

Standardization

23
Q

For the decontamination procedure itself, the IC will appoint a..

A

Decontamination officer

24
Q

The Decon officer is responsible for the required decontamination procedures which include the following
4

A
  • Establishing the decontamination sector
  • The timing on scene air requirements
  • What a meeting with command, the hazmat team, and the safety officer regarding the use of proper PPE buy those operating in both the hot zone and the the sector
  • Insuring personnel exit hot zone to the decon sector
25
Q

The decontamination zone is located in the ___ __and it extends from the___ ___To the__ __

A

warm zone, hot zone, cold zone

26
Q

The size of the Decon Zone and the number of the Decon Station will be determined by the

A

Hazmat team

27
Q

Once the Decon Zone is chosen, it shall be….

A

Marked clearly with some type of physical barrier

28
Q

Decontamination procedures

Decontamination agents and the the degree of decon Will be determined by

A

The hazmat

29
Q

Equipment or gear that cannot be decontaminated would be

A

Discarded by proper agencies

30
Q

Method of decontamination

When determining a method of decontamination, Consider the property of the hazardous material:(5)

A
  • Health hazards
  • Effects on the skin
  • Toxicity
  • Reactivity
  • Solubility
31
Q

Although it is difficult to standardize decontamination methods due to the numerous types of properties hazardous materials there are a few general methods: (3)

A

Dilution
Absorption
Degradation

32
Q

Reduces the concentration of the contaminants were less dangerous level

A

Dilution

33
Q

Absorbs the contaminant, but does not alter its chemical make up

A

Absorption

34
Q

Adding another chemical to the contaminant to render it harmless.

A

Degradation

35
Q

Accurate information must be obtained prior to using this method decon

A

Degradation

36
Q

Refer to ___ ___ on the specific hazardous material involved to determine signs and symptoms of overexposure

A

technical data

37
Q

Treatment of Contaminated Individuals

All personnel involved in a treatment protocol to utilize

A

protective clothing

38
Q

If immediate medical treatment is required, decontamination may be delayed until the victim is ___.
Medical treatment in these situations will be performed by ___ on scene.
Once the victim is stabilized, ______ is required prior to placement in Rescue Unit for further treatment or transportation.

A

stabilized
personnel
decontamination

39
Q

If persons who are potentially contaminated must be transported, the recieving hospital….

A

must be notified

40
Q

Medical Surveilance/Rehab
All JFRD personnel who are decontaminated will be required to undergo medical evaluation immediately upon ___ decon zone. These personnel will be observed in the rehab area for a minimum of __ minutes

A

exiting

30

41
Q

Incident Termination
The JFRD Should maintain security at the seem to prevent accidental contamination or injury to civilians.
This security area will be determined by the ____, and the responsibility for security should be passed to the appropriate ___ ____ ___.

A

IC

Law enforcement Agency

42
Q

When the __ has determined that the incident is mitigated and JFRD services are no longer required, control of the site will be passed to the appropriate agency, (3)

A

IC

EMRD, State Warning Point, DOT

43
Q

JFRD Personnel involved in hazmat incident will place an entry in the ___ ___ ___ ___ found on ______.
The report should include the ___ ___ involved and all ___ utilized

A

Special operation report builder
Fireweb
Specific Contaminants
equipment

44
Q

Following shifts shall thoroughly inspect equipment for contaminants. Any evidence of contaminants shall warrant further decontamination and notification of the _____ ____.

A

District Chief