3m ESWS Flashcards
Ships 3M Instruction
4790.8C
Ships Local CVN70 Instruction
4790.2H
Maintenance Action Form Work Request
4790.2K
Supplemental Form
4790.2L
Configuration Change Form
4790.CK
Chapter for Basic Safety
C1
Chapter for Electrical Safety
C9
Chapter for Mechanical Safety
C13
Chapter for HAZMAT Safety
C23
Replacement for HMUG
NSTM-670
Cent Sign?
Maintenance accomplished by higher authority
?
Mandatory Related Maintenance
3M Manager
XO-Capt Slaughter
3MO
LT Palmer
3MC
MRCS Lafortaza
3 Jobs of 3M
Manage PMS/Manage Prevent Maintenance
Manage Corrective Maintenance
Manage Zone Inspection Results
Programs Associated with
Preventative Maintenance
Corrective Maintenance
Zone Inspection
Sked 3.2
OMMS-NG
TSIMS
2 Feed Back Reports
Technical
Non Technical
3 Cats for Feed Back Reports
A
B
Urgent
8 Columns in 13 week report
MIP Name of Component Tag Out Block Maintenance Responsibility MRC Signature block Date Block Location Block
Syscom MIP control #
(02) Date Code (PQ13) Library code(Y/N) Repair Parts
MRC’s are updated every
10 years
Record of Change Columns
Force Revision
Date Entered
Date of Change
WCS signature
If a rate is required what three things could it be?
NECC
Safety PO
DCPO