3m Flashcards
What is an MRC used for?
Step by step instruction on PMS proedures
Who is authorized to second check a tag out
A knowledgeable person and responsible person qualified 3m 301
What do you do if a mip is not up to date
Inform your work center supervisor
What instruction pertains to the 3m system
Opnavinst 4790.4D
What is the purpose of a LOEP
Gives you a current and updated list of MIPs for your work center
What is the definiton of gundeck
Purposely signing off an incomplete PMS check
What does LOEP stand for
List of effective pages
When does the work center receive an updated LOEP and MIP
When new FR is received
What does the first segment of a syscom control number represent
The year and the month the card was last updated
Who is the command 3m manager
Exectuive Officer
What is contained in the 13 week folder
Accountability log
Who approves the cycle and quaterly boards
Department head
Who approves the weekly boards
Divison Officer
On a quarterly board what do the shaded blocks in the individual day represent
Days the ship or craft is expected to be underway
What is the opnavinst series used for
Navy safety program
What does it mean when the first two digits of a syscom control number are underlined
None of the above
How often is a 2m scheduled
Every second month within the interval between seven and ten weeks
What is the interval of a quarterly check
2-4 months
A work center supervisor has the authority to substitute tools on a mrc
true
What is the interval of a seminannual check
4-8 months
What is the definiton of preventive maintenance
Maintenance performed to avoid equipment failure
Laminated danger tags are authorized at MAREXSECRON THREE
false
How long can a piece of equipment stay tagged out for PMS
8 hours
How do you know if an MRC is current and up to date
Verify it against the MIP and LOEP
What information is on the CSMP
Shows a listing of all current jobs in the work center
Who updates the weekly boards
Work center supervisor
Who is the corivron three 3m coordinator
EN1 Beers
How do you know if a MIP page is current and up to date
Check it against the LOEP
What is RAR report
Indicate the amout and percentage of checks completed
How are mandatory related maintenance requirements identified?
By a pound sign in the parenthesis (#) next to the check
What is a FORM 4790.7B (or approved automated form)
FBR
The rate (skill level) block of a MRC identifies the skill of the person considered capable of performing the maitenance requirement cannot be substitue from that which is specified
false
the sked 3.1 program updates
All of the above
Who is responsible to ensure that the pms quarterly schedule is updated weekly
division offier
What is the standard reference for safety precautions for forces afloat
opnavinst 5100.9E
the word caution on a mrc signifies that operating procedures if not followed correctly my lead to
equipment damage or failure
What does the red danger tag signifies
Prohibits operation of equipment that could endanger personnel or equipment
The maitenance data system MDS is designed as the means for all maintenanance personnel to document all types of maintenance actions performed on equipment
true
What is the purpose of the PMS
All of the above
What does the last column of a weekly board indicate
upcoming checks for the next four weeks
Inactive equipment maintenance is identiefed on a pms quarterly schedules by drawing a
Red blue green
How often is a tag out audited
Bi weekly
When submitting an opnav 4790/ck and you dont have the allowance parts list number for the equipment what info is mandatory
equipment nameplate data
For a pms spot check the spot checkers must familiarize themselves with the maintenance requirement by
reading the requirements of the mrc
What does the cent sign next to a check mean
must be accomplish by higher authority
the cycle pms schedule displays the planned maintenance requirements to be performed during a period between major overhauls
true
what is the first question on a spot check form
Is the maintenance person 3m 301 qualfied
Who is responsible for maintaining the 13 week folder
work center suprvisor
A pms check that was not completed should be
circled on the weekly board