3M Flashcards

1
Q

Who sponsors the Navy’s 3M program?

A

CNO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What color is a Danger Tag?

A

Red

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What color is a caution tag?

A

Yellow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How often is an MRC with periodicity Q-2 required to be accomplished?

A

Quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the periodicity code R stand for?

A

Situational

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What best represents the main purpose of 3-M?

A

To ensure maximum equipment readiness meeting minimum specifications

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the procedure in verifying a MRC against the work center PMS manual?

A

MRC to MIP, MIP to LOEP, LOEP to ROC, check for the current force revision.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What does MIP stand for?

A

Maintenance Index Page

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does SPMIG stand for?

A

Standard PMS Material Identification Guide

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the SPMIG?

A

5 digit cross reference used to identify each tool, parts, or material listed on the MRC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What computer based system does the USS Carl Vinson use to schedule, track, and assign PMS?

A

SKED

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What SKED PMS schedule shows all the Maintenance Requirements to be completed for the week?

A

Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What sheet is signed by the maintenance person after completion of the maintenance?

A

13 week report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Who annotates on the 13 week report or back page the reason for non-accomplishment of maintenance requirements?

A

Work center supervisor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What color is a classified MRC?

A

Pink

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the conditions for a piece of equipment to be placed in an IEM status?

A

When the equipment will be:

  • Inactive for corrective maintenance
  • Inactive for 30 days or more
  • Stored at a location off ship
17
Q

What are the authorized calendar periodicity codes?

A
D - Daily
2D - Every 2nd day
3D - Every 3rd day
W - Weekly
2W - Every 2nd week
3W - Every 3rd week
M - Monthly
2M - Every 2nd month
Q - Quarterly
4M - Every 4th month
S - Semi annual 
8M - Every 8th month
A - Annually 
18M - Every 18 months
18
Q

What is the forces afloat safety manual?

A

OPNAVINST 5100.19E

19
Q

When is a supplemental form (OPNAV 4790/21) used?

A

When the work candidate request needs a drawing to accomplish the maintenance

20
Q

What document or instructions must be used when HAZMAT is used in performing PMS?

A

HMUG

MSDS

21
Q

What does the abbreviation FR stand for and how often is it issued?

A

FR = Force revision

Used 4 times a year

22
Q

What does the abbreviation IEM stand for?

A

Inactive Equipment Maintenance

23
Q

What does the acronym JSN stand for?

A

Job sequencing number

24
Q

What are the 3 parts of a job control number?

A
  • Unit identification code (UIC for CVIN: 07993)
  • Work center
  • Job sequencing number
25
Q

What color is an out of commission label?

A

Red

26
Q

What color is an Out Of Calibration label?

A

Orange

27
Q

Who does the maintenance person notify when there is a problem conducting PMS?

A

WCS

28
Q

What provides a listing of maintenance index pages assigned to each work center?

A

LOEP

29
Q

Name the ships maintenance management system manual.

A

OPNAVINST 4790.4C

30
Q

Who is the 3M Functional Manager on board?

A

3-M coordinator

31
Q

If an MRC requires a maintenance person of a certain rate to perform maintenance, can someone of another rate be assigned to perform the maintenance?

A

Yes, if the MP possesses the required skill set

32
Q

When an MRC calls for a certain NEC for the maintenance person to perform the maintenance can anyone else be assigned to the maintenance?

A

No

33
Q

What is the four digit code located at the lower right corner of the MRC used in cataloging MRC’s?

A

SYSCOM MRC Control Number

34
Q

What is a technical bulletin containing information about material’s composition, chemical, and physical characteristics, health and safety hazards, and precautions for safe handling MRC?

A

Material Saftey Data Sheets

35
Q

How many weeks worth of 13 week accountability logs are required to be maintained in the 13 week accountability file?

A

14… 13 previous weeks plus the current week

36
Q

Who maintains the PMS master file?

A

3-M Coordinator

37
Q

Who is the 3M manager onboard CVN70?

A

XO