3.4 JP-5 And Transfer System Flashcards

0
Q

What monitors and and controls the transfer system components?

A

control console

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Within the Fill and Transfer system the transfer pumps are rated at ________ gpm at _______ psi discharge pressure.

A

200

50

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Up to how many transfer pumps may be used when transferring between storage tanks?

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

In transfer piping, how many locations are cross-connected to form loops?

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The suction header cross connect has a butterfly cutout valve and _____________.

A

pipe blind (spectacle flange)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many tanks may be filled from any filling station?

A

All

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many tanks per manifold?

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the maximum filling rate of a JP-5 tank?

A

500 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What receives fuel from the transfer pumps and discharges the purified fuel to the service tanks?

A

Centrifugal Purifiers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When filling service tanks, close fill valves at what percentage of capacity?

A

95%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When operating the JP-5 Fill and Transfer System the number of tanks open must be sufficient to limit flow to _________ per tank and minimum of ___________ tanks.

A

500 gpm

six

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When stripping stowage tanks take ________ samples.

A

visual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Only ______ transfer pump may be aligned to each purifier when transferring to the service system.

A

one

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Two purifiers installed in each pumproom (forward and aft), each having a capacity of ________ gpm.

A

200

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How many filling stations on the main deck provide for receiving and offloading JP-5?

A

Five

How well did you know this?
1
Not at all
2
3
4
5
Perfectly