329 Flashcards

Motor Power Connections and NEMA Enclosures

1
Q

How Many Leads does a General Purpose Dual Voltage 3 PH Motor have

A

9 leads.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How Many Leads does a Dual Voltage 3 PH Motor with a Wye Start / Delta Run Come with

A

12 leads.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How are the Windings for a Dual Voltage Wired

A

Its is wired in series for the higher voltage and in parallel for the lower voltage. And the current in the windings does not change. But the circuit current will be halved if changing from a low voltage system to a high voltage system. The high voltage system has half the current as the low voltage one. Line current changes but winding current docent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What Additional Leads will some Motor Starters with both Thermal and Overload Protection Come with

A

P leads, they function to connect overload protection to the motor. It is like a middle man between overload relay (protection) and a (T leads) motor.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Can a Wye or Delta Power Supply Feed a Motor with either a Delta or Wye Configuration

A

Yes. But if it is a motor with 9 leads (wye) it cant work, the opposite is true for a delta wound motor with 6 leads. That would just be fine.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the Types of Motor Starter Enclosure Classifications

A

Open type(no enclosure), NEMA, or IEC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Where would you Install an Open Type Enclosure

A

In a control cabinet or motor control center (MCC)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is a Motor Control Center (MCC)

A

This is an enclosure that houses both the OCPD for a motor and its starter as well. It sometimes comes with a meter that reads info conditions like voltage, current, andphase circuit conditions. The MCC take up less space, it is a cabinet.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does NEMA Stand for

A

National Electrical Manufacturers Association

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What does the IEC stand for (In reference to Motor Starters)

A

International Electrotechnical Commission

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the Range of NEMA Motor Starters and Contactor Sizes

A

Sizes: 00 (smallest, also called “two ought” or “double ought”) - 9 (biggest)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How are IEC Contactors and Starters Sized

A

In a none standardized way, It is designed based on the application requirements needed, these are called utilization categories. The starters are selected for particular applications.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are a Few Things that can Affect the Operational Life of a Contactor or Starter

A

Temperature, vibration, altitude, dust, shock, chemical corrosion, etc.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which would Require More Consideration for Circuit Design a NEMA or IEC Starter

A

An IEC starter would.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Where is the Enclosure Selection Table Located in the NEC

A

Table 110.28. It is referencing NEMA 250.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What Section Covers OSHA’s Rules on Material Handling, Storage, Use, and Disposal

A

OSHA’s subpart H of their construction standards.

17
Q

What are the Rules for Material Storage in a Budling Under Construction

A

No material should be placed within 6ft of inside floor openings and 10ft of an exterior wall that is lower than the height of the material being stored.

18
Q

How is the Maximum Height of Stored Brick Stacks

A

Not more than 7ft high. A loose stack of bricks past 4ft must be tapered and for masonry 6ft.

19
Q

What is the Maximum Height of Lumber Piles

A

20ft. If Stacked Manually 16 ft.

20
Q

What Height does OSHA Require a Chute for Dropping Materials Outside the Building Exterior Walls

A

20ft. but if you are dropping material through the building floors, barricade the area 42inches high and 6 ft wide

21
Q

A Dual Voltage 3 PH Motor has how many Windings per Phase

A

2 Windings.