#31 Building Walls Flashcards
33
Position label up, out towards the rear or in towards the center of trailer.
34
always attempt to place opening of the box up
35
orient boxes so the ribs or furrows (flutes) are vertical to prevent damage to a Package.
36
Follow orientation instructions printed on box, arrows or this side up.
37
Option #1 cornerstone package 18 to 24 inches in depth and 12 to 24 inches in height
38
Cornerstone loaded in left corner against previous wall. no space between package and previous wall.
39
select & load cornerstone for next wall at anytime while building present wall
40
Option #2 Primary shelf - Continue bottom shelf left to right keeping front of wall nearly flush.
41
Option #3 Secondary or new shelf- if next selected package is taller than primary shelf, start new shelf.
42
Option #4 Fill empty space or level shelves- if package is shorter than primary shelf
43
do not exceed height of shelf .
44
determine height of next shelf; consider size of available packages.
45
tighten or ‘lock in’ shelf with last package on right of the wall.
46
Use of “Ts” or Bridges will aid in weight distribution.
47
Build at least 3 shelves per wall to avoid columns.