True or False?
A work center can take credit for a PMS check if 80% of the check can be completed
FALSE
What are the duties and responsibilities of the second person on an equipment tag-out procedure?
To act as an independent reviewer, verifying proper tag attachment and positioning of switch/valve
The Maintenance Data System (MDS) is the means in which work center supervisors can do what?
- Report corrective maintenance
- Generate a request for assistance outside of the command
- report the installation of a new configuration change
The LOEP does not contain what information?
The periodicity code for each maintenance requirement
True or False
An OPNAV 4790/CK is used to report discrepancies/deficiencies in the PMS system
False
Which document provides a listing of the MIP’s assigned to a specific work center?
List of Effect Pages (LOEP)
Who is the ship’s 3M manager?
Executive Officer
If more than one piece of equipment will be maintained by an MRX, the location block will read what?
See Location Guide List Below
An MRC card with SYSCOM MRC control number A7 $ABG N has a production (birth) date of?
October 2017
Which of the following is NOT an example of an IEM MRC?
-LU-1
-SU-2
-PM-2
-U-1
U-1
Which tag out log would a Supply Department DCPO use to accomplish a DC related tag-out?
Engineering Tag-out Log
Which document provides instructions and references required for use in the 3M system?
OPNAVINST 4790.8(series)
Who may update the weekly PMS schedule in SKED to indicate that a PMS check has been completed?
Maintenance person who accomplished the PMS check
What is OPNAVINST 5100.19E series?
Navy Safety and Occupational Health (SOH) Program Manual for Forced Afloat
What does MIP stand for?
Material Index Page
How often should PMS check 6641/005 M-9R be accomplished?
Once a month or as required
Equipment should be placed in an IEM Status 2 when…?
Equipment is not going to be used for 30 days or more and is scheduled for overhaul
Danger and Caution tag audits are conducted how often?
Weekly
On the MIP, MRC A-1 has a SYSCOM CONTROL NO of 11 BWQD Y. What does the “Y” indicate?
Repair parts are required
In SKED or on the 13 Week Report, M-1 (#R-1) signifies what?
Monthly one has a mandatory related maintenance
“S 24 DWYG N” from this MRC SYSCOM CONTROL NO you know the MRC is…?
Classified Secret
True or False
The following operational PMS appears on your Work Center’s schedule: A-1 (#q-1). You are able to complete A-1 MRC, but Q-1 must be rescheduled due to corrective maintenance. The A-1 may be X’d off as complete, but the Q-1 must be rescheduled.
False
Normally, how often is a Force Revision (FR) produced?
Semi-Annually
The ships underway schedule can be viewed on which of the following tabs in SKED 3.2?
Events
How many weeks are in a quarter?
13 mostly, sometimes 14
A monthly MR can be scheduled at what interval?
3-6 weeks
A quarterly MR can be scheduled at what interval?
2-4 months
A semi annual MR can be scheduled at what interval?
4-8 months