301 (3M Test) Flashcards

1
Q

What is IDLH?

A

Immediate danger to life and health

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who is overall responsible for 3M?

A

CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is HST 3M?

A

NAVSEAINST 4790.8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is ORM?

A

Operational Risk Management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What color is a classified MRC and where is it noted?

A

Pink, Top and Bottom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

IEM

A

Inactive Equipment Maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

IEM Schedule 1

A

Staying on the ship, Maintenance for when the equipment is back up and running

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What version of SKED do we use?

A

SKED 3.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

WARNING pertains to

A

Personell Safety

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

CAUTION pertains to

A

Equipment Safety

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Where can you see maintenance awaiting action?

A

MY TASK

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Who signs the 13 week accountability log?

A

DIVO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

T/F WCS can substitute tools, materials, household goods that meet or exceed Sub Category (SCAT) requirements

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A listing of those warnings and references which direct attention to possible hazards to personnel

A

Safety Precautions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A report date is the date that

A

the LOEP is produced

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

HMUG

A

Hazardous Material User Guide

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

HMUG

A

NSTM Chapter 670, Volume 2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

An asterisk * indicates

A

Safety of ship item

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A brief description ofeach maintenance requirement

A

Maintenance Requirement Description

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

The average time, per equipment, per person needed to perform maintenance

A

Man Hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Maintenance items that can be accomplished concurrently with another maintenance requirement for timesaving or manpower considerations

A

Convenience Maintenance

22
Q

Maintenance requirement when specific conditions are either present or not met on the MRC

A

Conditional

23
Q

A Periodicity code of 3M means?

24
Q

If a maintenance action or step is not understood, you should?

A

Stop all work and report to WCS

25
What is FBR?
Feed Back Report
26
How many FBRs are there?
3. Non technical, technical, urgent
27
What is TPMTE
Tools, Parts, Materials, Test Equipment
28
What is in the TPMTE
tools, parts, materials, test equipment, and miscellaneos items necessary to perform maintenance action
29
In order to perform maintenance in a confined space
Gas Free Engineer must test the space to ensure it is gas free
30
A preventive maintenance task that is to be accomplished only when a specified situation, event, or circumstances occur
Situational Requirement
31
PPE must be worn
Always
32
MIP
Maintenance Index Page
33
Advance Change Notice
ACN, authorizations for and a record of changes to an existing MIP or MRC, issued in advance of the next Force Revision
34
IEM Periodicity codes
LU, PM, SU OT Lay up, Planned maintenance, Start up, Operational testing
35
Configuration change forms
OPNAV 4790/CK
36
Safety Manual
OPNAVINST 5100.19
37
A planned change, modification, or alteration of any hull, Mechanical, or Electrical equipment in service
MACHALT
38
Flip Page
Explains why a maintenance action was not completed
39
At a divisonal level who approves the weekly PMS schedule?
DIVO
40
At a department level, who reviews and approves cycles and quarterly schedules?
Department Head
41
When hanging a tag, the second checker may not be
present in the same space
42
LOEP
List of MIPs applicable to the workcenter
43
What log documents changes, additions, or revisions in the work center PMS manual
Change Page
44
MIP Description
Lists a complete set of MRCs by periodicity. Provides a description of maintenance, MRs, related maintenance, and other information necessary to schedule and manage PMS
45
EGL
Equipment Guide List
46
EGL Description
Lists a number of identical equipments that applies to an MRC.
47
LGL
Location Guide List
48
LGL Description
Gives the location of all equipment covered by the MRC
49
For a SYSCOM control number beginning with 94, what does it mean?
September 2014
50
T/F in the "procedure" block WCS may line out any non applicable line items
True
51
Once a maintenance has been completed, what is required to be performed
Spot Check
52
What is the ships Electrical Safety Manual?
NSTM 300, Or the answer with E attached cuz Electrical