3-m Flashcards
What is the requirement for a CASREP
48 hours and the maintenance requirement reduces the activity’s ability to perform an assigned task or mission (primary or secondary).
Conventional MIP SYSCOM Control Number.
The first segment identifies the equipment group(-). The second segment identifies a specific subgroup or component number within an equipment group (/). The third segment identifies a distinct version within that equipment subgroup (-). The fourth segment contains two characters identifying the month and year the MIP was prepared or revised. The final character is a number indicating the last digit of the year the MIP was prepared or revised
What does the month of October look like on SYSCOM number
A
What does a * after the MRC
Safety of Ship item
What date range do you have to complete 2W
9-19 days
What date range do you have to complete 3W
14-28 days
What date range do you have to complete a monthly check
21-41 days
What date range do you have to complete a 2m check
41-83 days
What date range do you have to complete a quarterly check
61-121
What date range do you have to complete a 4m check
83-165
What date range do you have to complete a semiannual check
121-243
What date range do you have to complete a 8m check
165-331
What date range do you have to complete a 9m check
+- 90 days
What date range do you have to complete a annual check
+- 90 days
What is a R check
Situational