2.9 Design for manufacture and project management (key terms) Flashcards

1
Q

quality assurance (QA)

A

The procedures and policies put in place to reduce waste and ensure manufactured products are produced accurately within set tolerances

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Scrum

A

A project management method, which focuses on the organisation of workforce teams to reduce the lead time of projects

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

total quality management (TQM)

A

A project management system focusing on QA through the full involvement of the workforce in continual improvement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

critical path analysis (CPA)

A

A project management method used to analyse all individual stages within a project and plan the effective and time efficient completion of each element within the desired schedule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

quality control (QC)

A

The monitoring, checking and testing of materials, components, equipment and products throughout production to ensure they conform to acceptable tolerances

How well did you know this?
1
Not at all
2
3
4
5
Perfectly