26 to 64 bulkhead Flashcards
1
Q
What is the watertight integrity features here?
A
- Main access hatvh
- VEX Hull Valve and flap valve
- BWA Hull valve
- High and Low salvage Hull valve
- No 1 and 2 LP master blow and drain Hull valve
- Depth gauges
- Snort induction Hull valve
- Voice pipe
2
Q
What are the major offices here?
A
- Sonar cabinet space
- Sound room
- Control room
- Communications office
- Cesm office
- Co’s cabin
- RESM office
- BWA compartment
3
Q
What major equipment do we find in sonar cab space
A
- FWD escape compartment
- Pyrotechnic lockers master
- Flood valve
4
Q
What major equipment do we find in Sound room?
A
- Sound operator console
- Echo sounders
5
Q
What major equipment is found in the Control room?
A
- Command console
- SCOOW position
- ACMS
- WECDIS
- Radar operators consoles
- Chalfont Console
- Oprtronics consoles
6
Q
What major equipment do we find at ship system control console?
A
- SCCO Position
- Fire detection panel
- Planesman console
- Fire detection panel
- Quick acting valves
- Vent fan control panles
- Yellow phone
- 999
7
Q
What are major hazards from 26 to 64 bulkheads?
A
- Pyrotechinics
- HPA burst
- Hydraulic burst (sonar can space)
- EBS Burst
8
Q
What firefighting equipment is here?
A
- CO2 extinguisher
- WSC water fog system initiation button on SCC
- WSC water fog system initiation button on CCC
- AFFF extinguisher
- Dry powder extinguisher
- Smoke curtains
- Drager
- CO2 injection ports in cabinets
9
Q
What comms do we have on 26 to 64
A
- General alarms
- DIAL
- Sound powered telephone
- Voice pipe
10
Q
What access and egress do we have?
A
- Through bulkhead 26 dcb
- MAH to fin above
- Aft hatch ladder down to 2 deck