1ST TEST Flashcards

1
Q

Definition: Construction drawing

A

A drawing showing electrical facilities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Definition: Point of delivery

A

The location on the customer’s building, structure, or premise where all
wires, conductors, or other current-carrying devices of the customer join or
connect with wires, conductors or other current-carrying devices of the
Service Provider

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

2.5” APPROVED DUCT SIZES, TYPES, AND APPLICATION

A

GREY SCHEDULE 40 PVC: USED FOR DIRECT BURIAL APPLICATION, BENDS AND SWEEPS 36” x 90º or 36” x 45º for vertical, 12 1/2’ x 45º for horizontal

HDPE SCHEDULE 40 (WAVE RIB OR DURA LINE SMOOTH OUT/RIBBED IN): USED FOR DIRECT BURIAL APPLICATION AND DIRECTIONAL BORING, BENDS AND SWEEPS 36” x 90º for vertical, 4’ x 90º for horizontal

GREY DB-120: USED FOR DIRECT BURIAL APPLICATION, SERVICE LENGTH 250’ OF LESS, TOTAL BENDS IN CONDUIT RUN 270 DEGREES OR LESS, NO CROSS TRENCHING

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

2.5” VERTICAL SWEEPS

A

· Steel Sweep
2 1/2” x 36” x 90º sweep

· Grey Polyvinyl Chloride (PVC) electrical grade, Schedule 40 for direct burial installation
2 1/2” X 36” X 90º or 2 1/2” x 36” x 45° sweep

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

4 & 6” APPROVED DUCT SIZES, TYPES, AND APPLICATION

A

4” & 6” GREY POLYVINYL CHLORIDE (PVC): DIRECT BURIAL INSTALLATION, 12 1/2’ x 45º for horizontal

4” & 6” SCHEDULE 40 HDPE CONDUIT- DURA LINE COEXTRUDED: DIRECT BURIAL INSTALLATION, Preferred radius of 12 ft. 6 inches for 4 or 6 inch duct system. A minimum of 4 ft. radius can be used if
approved by Design Services.

4” & 6” CONDUIT FOR DIRECTIONAL BORING: Arnco or Dura-line (HDPE) SDR-13.5, Bore-Gard Trenchless Raceway from Prime Conduit Inc

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

4” & 6” VERTICAL SWEEPS

A

· Steel Sweep
4” x 36” x 90º sweep or 6” x 48” x 90º sweep

46kV POWER POLE ATTACHMENT
· Rigid Aluminum
6” x 48” x 90° sweep

CONDUIT INSTALLATION -VERTICAL INTO COMPANY EQUIPMENT
4” & 6” CONDUIT SWEEPS
· Grey Polyvinyl Chloride (PVC) electrical grade, Schedule 40 for direct burial installation
4” X 36” X 90º sweep
6” X 48” X 90º sweep
6” x 48” x 45° sweep

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

FEEDER CABLE/WIRE SIZE AND DEFINITION

A

OVERHEAD: MAINTENANCE 4/0 ACSR, 2/0 CU (COPPER) OR LARGER, NEW 477 ACSR
UNDERGROUND: 1100 AL

Feeder – The portion of a distribution circuit using 600-amp rated equipment and protected
by a substation breaker or recloser

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

BRANCH LINE (200A DISTRIBUTION) CABLE/WIRE SIZE AND FUNCTION

A

FUSED DOWN FROM 600A FEEDER TO 200A, STEPPING DOWN ALLOWS US TO TAP XFMRS TO (MY OWN DEFINITION)

OVERHEAD: MAINTENANCE SMALLER THAN 4/0 ACSR, 2/0 CU (COPPER), NEW #2 ACSR
UNDERGROUND: 1/0 AL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

PME TYPES AND FUNCTION

A

ALLOWS FOR NEW JUNCTIONS FOR UNDERGROUND FEEDER (SWITCHED 600A) AND STEP DOWN TO DISTRIBUTION (FUSED 200A)

PME-9 2 SWITCHED AND 2 FUSED
PME-10 4 SWITCHED
PME-11 3 SWITCHED AND 1 FUSED

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

CAPACITOR FUNCTION

A

Capacitors are primarily installed to correct the power factor of the distribution circuit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

CONVERSION BANK PURPOSE

A

Conversion banks are 7970-2400 V step-down transformers connected wye-wye, used to
source 4-kV load using 13.8 kV circuits. The intended uses for conversion banks are:
A. A temporary fix to relieve overloads and/or add backup capacity for the 4-kV
circuits or other conversion banks.
B. A temporary 4-kV source when converting to 13.8 kV to reduce the amount of
immediate conversion work.
C. A permanent service transformer for 4-kV primary-metered customers.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

ARRESTER PURPOSE

A

Arresters are used to protect power lines and equipment from momentary overvoltages.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

CUTOUT PURPOSE

A

FUSED AND SOLID BLADE. DEVICE USED TO BREAK VOLTAGE FROM SOURCE (MY OWN DEFINITION)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

PEDESTAL PURPOSE

A

SECONDARY JUNCTION CABINET, 6 POSITIONS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

XFMR PURPOSE

A

STEP DOWN FROM HIGH VOLTAGE TO LOW VOLTAGE OR VICE VERSA, STEP DOWN OR STEP UP VOLTAGE DEPENDANT ON COILS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

EASEMENT PURPOSE

A

Service provider shall be granted all rights-of-way and easements in a form acceptable to and at no cost
to company for the erection, maintenance, repair, replacement, and removal for use of all distribution
facilities necessary or convenient for the supplying of electric service to the customer. It is the
responsibility of the customer to provide such easements and rights-of-way

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

LEGAL DESCRIPTION DEFINITION PURPOSE

A

In surveying and property law, a land description or legal description is a written statement that delineates the boundaries of a piece of real property. In the written transfer of real property, it is universally required that the instrument of conveyance (deed) include a written description of the property.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

PERMIT PURPOSE

A

REQUIRED BY THE GOVERNMENTAL AGENCY TO PERFORM WORK

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

PUBLIC UTILITY EASEMENT DEFINITION

A

A PUE is a right granted to a utility company to access and maintain its facilities on private property

20
Q

RIGHT OF WAY DEFINITION

A

the legal right, established by usage or grant, to pass along a specific route through grounds or property belonging to another:

21
Q

PRESCRIPTIVE RIGHT DEFINITION

A

A prescriptive right is a type of right that is obtained through continuous use or existence of something for a certain period of time. For example, if a nuisance has been present for 20 years, a prescriptive right to continue it may be acquired as an easement appurtenant to the land on which it exists

22
Q

LEASE

A

A CONTRACT BY WHICH ONE PARTY CONVEYS LAND, PROPERTY OR GOODS TO ANOTHER FOR A SPECIFIED TIME USUALLY IN RETURN FOR A SPECIFIED PAYMENT

23
Q
A
24
Q

CLEARANCE AROUND PED, J-10, J-30, AND XFMR (SIDES, BACK, FRONT)

A

3’ SIDES AND BACK, 10’ FRONT

25
Q
A
26
Q
A
27
Q
A
28
Q
A
29
Q
A
30
Q
A
31
Q
A
32
Q
A
33
Q
A
34
Q
A
35
Q
A
36
Q
A
37
Q
A
38
Q
A
39
Q
A
40
Q
A
41
Q
A
42
Q
A
43
Q
A
44
Q
A
45
Q
A