16 Collapse Hazards of Buildings Under Construction Flashcards

1
Q

The major life hazard during a daytime fire in a high-rise under construction will be ___________________ and especially the worker inside the ______________.

A

workers trapped on upper floors / cab of a crane

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The major life hazard of a high-rise under construction after work hours will be ________________.

A

the firefighters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

NFPA designates buildings under construction or demolition as ___________________.

A

Special occupancy structures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

“Special Occupancy Structures” kill ___________ firefighters per 100,000 fires.

A

8 to 10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Store and office fires kill _________ firefighters per 100,000 fires.

A

4 to 8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Residence buildings kill ____ firefighters per 100,000 fires.

A

4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

There are two different types of framework for high-rise structures:

A
  1. Reinforced concrete
  2. Structural steel
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

One concrete floor is poured every _________.

A

48 hours

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How many days until concrete reaches its maximum strength?

A

27

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

There are two types of concrete spalling experienced during fires.

A
  1. Explosive - which propels concrete downward with an explosive force and is accompanied by a loud noise.
  2. Dropping spalling - similar to a plaster ceiling collapse
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Because of their fire history, shanties are required to be __________________ construction and at least ____________ from the building under construction.

A

Noncombustible / 30 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Types of fires at construction sites:

A
  1. Stored lumber
  2. Wood shanty
  3. rubbish
  4. Propane
  5. Coal and coke heating equipment
  6. Electric
  7. Torch cutting and welding
  8. Flammable liquid
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The most serious type of fire at construction sites involve the __________________ used to support a cast-in-place concrete floor.

A

combustible formwork

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the recommended strategy to extinguish fires in formwork supporting floors?

A

Outside aerial master streams

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What will be the major cause of fire extension of a framework fire in a cast-in-place building under construction?

A

Burning timbers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are two reasons asbestos-removal protective measures required by the EPA create problems during a fire?

A
  1. Plywood encasing the building adds tons of combustible material into the building
  2. The sealing of the building with plywood prevents ventilation to remove smoke during a fire.
17
Q

At what height/floor level do most states require a vertical standpipe system to be installed and operational during construction?

A

75-feet or 7th floor

18
Q

Which standpipe valve is often overlooked?

A

The basement standpipe valve (often used as a condensation drain)

19
Q

When is the best time to do a pre-plan inspection in a building under construction or demolition?

A

On a weekend