1.3 Opportunity Cost and PPCs Flashcards
1
Q
What is a production possibility curve (PPC) ?
A
A PPC shows the maximum output combinations of two goods or services that can be produced when fully utilising current resources and technology, in a given period of time
2
Q
What is infrastructure?
A
Large scale fixed physical capital that is required for economic activity to take place