<1 Hr Actions Flashcards

1
Q

DNBR > 1.14

Fuel Centerline Temp > 5080 F

A

2.1.1 Reactor Core SLs

Mode 1 and 2

Restore compliance and be in Mode 3
1 Hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

RCS Pressure > 2733.5 psig

A

2.1.2 RCS Pressure SL

Mode 1, 2, 3, 4, and 5

In Mode 1 or 2: Restore compliance and be in Mode 3
1 Hr

In Mode 3, 4, or 5: Restore compliance
5 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

One or more RTS Manual Actuation Functions with two manual actuation channels inoperable

A

3.3.5 RTS Manual Actuation

MODE 3, 4, or 5

Initiate action to fully insert all rods
AND
Place the PCS in a condition incapable of rod withdrawal.

1 Hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

One or more required DC Electrical Power Subsystems Inoperable

A

3.8.2 DC Sources (Shutdown)

MODES 5 and 6,
During movement of irradiated fuel assemblies

Declare affected required features inoperable
Immediately

OR

Suspend movement of irradiated fuel
AND
Suspend operations with a potential for draining Rx
AND
Suspend operations involving positive reactivity additions that could result in loss of SDM or boron concentration
AND
Initiate action to restore to operable
Immediately
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

One or more required inverters inoperable

A

3.8.4 Inverters (Shutdown)

MODES 5 and 6,
During movement of irradiated fuel assemblies

Declare affected required features inoperable
Immediately

OR

Suspend movement of irradiated fuel
AND
Suspend operations with a potential for draining Rx
AND
Suspend operations involving positive reactivity additions that could result in loss of SDM or boron concentration
AND
Initiate action to restore to operable
Immediately
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Two inoperable divisions that result in a loss of safety function

A

3.8.5 Distribution Systems - Operating

MODES 1, 2, 3, and 4

Enter LCO 3.0.3
Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

One or more required DC or AC instrumentation and control bus electrical power distribution subsystems inoperable

A

3.8.5 Distribution Systems (Shutdown)

MODES 5 and 6,
During movement of irradiated fuel assemblies

Declare affected required features inoperable
Immediately

OR

Suspend movement of irradiated fuel
AND
Suspend operations with a potential for draining Rx
AND
Suspend operations involving positive reactivity additions that could result in loss of SDM or boron concentration
AND
Initiate action to restore to operable
Immediately
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

One or more batteries in one division with one or more battery cells float voltage < 2.07 V and float current > 2 amps

A

3.8.7 Battery Parameters

When associated DC electrical power sources are required to be OPERABLE

Declare associated battery inoperable
Immediately

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

One or more penetration flow paths with 2 containment isolation valves inoerable

A

3.6.3 Containment Isolation Valves

MODES 1, 2, 3, 4

Isolate affected penetration flow path by use of at least one closed and deactivate automatic valve, closed manual valve, or blind flange.

1 Hr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly