1 Flashcards
central point of the maintenance effort
Production Control
nerve center or the maintenance dept
Maintenance Control
provides factual info generated at the lowest level of maintenance as to inventory and capability.
(12 month trending)
SCIR(Subsystem Capability and Impact Reporting)
coordinates and controls the supply functions of the department
Material Control center
within QAWB (quality assurance workbench), document internal product deficiencies with these…
DWOs(Discrepancy work orders)
completed misuse and abuse forms(OPNAV 4790/108) are retained for _ years
2 years
inspection record
OPNAV 4790/22A
POC between work centers and data services, responsible for MDS and NALCOMIS
SA/A (system administrator/analyst)
establishes a process to evaluate the material condition of fleet aircraft and use the info to plan FRC maintenance programs
ASPA (aircraft service period adjustment)
production control system used to schedule, induct, and control D-level workload
NDMS (NAVAIR Depot Maintenance System)
allows you to regulate events, rather than have them regulate you
Prevention
completed aeronautical work documentation for non-critical safety item components (FRC to FISC) retained for
6 months
type of deficiency defect is likely to result in hazardous or unsafe conditions
critical
the efficient attainment of objectives
Management
the MMP is published the AIMD/IMA for use by what division
Production
Navy’s major information system, used in support of the Life Cycle Logistics System
NALDA
manages Marine Air Traffic Control and Landing Systems
COMNAVAIRSYSCOM
Permanent CDQARs may be assigned when an activity has how many or less aircraft
4