1-5 Ton crane Flashcards
Telescopic boom cranes manufactured after February 28, 1992 must be equipped with a device which prevents damage from contact between the traveling block/ball and the boom tip this device is called what?
Anti 2 blocking device
According to OSHA accessible areas of an operating crane must always be barricaded within?
The swing radius of the rear of the rotating substructure
When working near powerlines when is a single person required?
When the crane is within a booms length of the prohibited zone
A pre-lift meeting is an operational requirement for a suspended personal platform true or false?
True
What prohibits the boom from falling down on a hydraulic crane in the event of a hydraulic line rupture?
Load holding valve 
Only use what? grade chain for overhead lifting.
Alloy grade 8/80 or 10/100
To determine the necessary parts of line and operator would need to divide the suspended load by either the SWL/safe working load for the PLP/permissible line pull true or false?
True
SWL/safe working load of a cranes wire rope is 4000 pounds what is the safe working load of four parts of line?
16,000
When working on outriggers the only time they should be less than fully extended is when?
When there is a load chart for this configuration
An A/D director is?
A competent/qualified person,
The sole person incharge of Assembly and disassembly of the crane,
The sole person responsible for overseeing operations regarding erecting and dismantling of tower cranes 
The capacity of a choker hitch is what? percent of a vertical swing hitch.
70-80%
What is the removal criteria for IWRC running wire rope?
6 randomly distributed broken wires and one lay or 3 broken wires in one strand in one lay
Significant distortion of the wire rope structure such as, kinking, crushing, birdcages, understranding, core failure, or core protrusion are what?
Category 1 apparent deficiancies
How does the operator verify the LMI’s Bloom length or load radius reading?
Actual measurement
What does LM I stand for?
Load moment indicator
A four legged steel bridal sling has how much capacity increase of a 3 legged steel bridal sling ?
No increase
When the number of wraps on the drum increase, what happens?
Permissible line pull may decrease
What is the ANSI wear criteria standard for taking wire rope out of service
Metal loss of 1/3 of the diameter of the outside
When an operator arrives on a job site and the crane is already erected how would he test the auxiliary and main hoist brakes
Lift the load slightly off the ground, apply the brakes, see if they hold
Blocking under outrigger stabilizers must be sufficient to what?
Sustain the entire weight of the crane and it’s Maximum Load 
The term upperworks refers to what part of the crane
Above the turntable
The removal criteria for rotation resistant wire rope is what?
2 randomly distributed broken wires in 6 rope diameters or 4 randomly distributed broken wires in 30 rope diameters
When using cranes of different capacities in a two crane pick, the crane with the larger net capacity should what?
Should be hooked at a distance closer to the loads center of gravity
A positive acting anti-two block device is an operational requirement for suspended personnel platform’s true or false?
True
Electrocution warning signs should be posted where?
In the cab in view of the operator, and at least two on the outside of the equipment
The table a minimum clearance distance during operation of a crane in vicinity of a 200Kv powerline is what?
15ft
The removal criteria for a sling replacement is what?
10 randomly distributed wires in one rope lay or five broken wires in one strand in one rope lay