03.1 Planning for Production Flashcards
It means assigning the right amount of resources to each activity at the right time.
Resource Allocation
Objective of Resource Allocation
Calculate its budget
It is simply trying to maintain uniform daily use of a resource (or resources) for the entire life cycle of the project or for the longest continuous segment of it.
Resource Leveling
Also called resource loading
Resource allocation
It is the assignment of the required resources to each activity, in the required amount and timing.
Resource allocation
It is minimizing the fluctuations in day-to-day resource use throughout the project.
Resource leveling
It is usually done by shifting noncritical activities within their available float.
Resource leveling
It attempts to make the daily use of a certain resource as uniform as possible.
Resource leveling
It may be defined as the maximum amount of time an activity can be delayed without delaying the early start of the succeeding activities.
Free float
include labor, equipment, and materials.
Resources
Leveling resources, starting from project start and going through all project activities, fulfilling their resource requirements and maintaining the total resource usage within the set limits.
Forward resource levelling
Some activities have to be delayed until resources are available and the project duration may be greater than planned, causing the finish date to occur later than originally scheduled.
Forward resource levelling
Leveling resources, starting from project finish and going (backward) through all project activities, fulfilling their resource requirements and maintaining the total resource usage within the set limits.
Backward resource levelling
The project may have a longer duration than originally allowed and project start may have to occur before the scheduled date.
Backward resource levelling
It is defined as the planning and controlling of all necessary efforts to ensure that the correct quality and quantity of materials and equipment are appropriately specified in a timely manner, are obtained at a reasonable cost, and are available when needed (Construction Industry Institute [CII] 1986b)
Materials Management