Hard engineering case study Flashcards
1
Q
Heysham and Morecambe
A
4 defence options: Hold the line Do nothing but monitor Retreat the line Advance the line
2
Q
Strategy 1
A
Rock armour to enhance and protect existing sea wall
Boulders of locally sourced limestone placed along promenade
3
Q
Strategy 2
A
Breakwaters and rock groins
10 of these built at intervals in front of the town
Just under 1 mil tonnes of locally sourced limestone boulders used
4
Q
Strategy 2
A
Breakwaters and rock groins
10 of these built at intervals in front of the town
Just under 1 mil tonnes of locally sourced limestone boulders used
5
Q
Strategy 3
A
Repaired and replaced sea walls
Between 2015-18 4km of 30 year old sea wall was replaced